Shandong Hongteng Fengda Metal Material Co, Ltd.
                                                                                                           
Verified Supplier
13 Years
Since 2013
Menu

Round Galvanized Pipe Q195 Q235B 20# 45# Q345B Galvanized Round Tubing

Price Negotiable
Price: USD 1000-2000
MOQ: 1Ton
Delivery Time: 5-15 working days
Brand: HTFD
Product Description

Q195,Q235B 20# 45# Q345B Q195-Q355 ASTM A53 Galvanized Round Pipe 

Hot Dip Galvanized Steel Pipe
 

Size
 
OD
 
21.3mm~1620mm(round)
 
Thickness
 
0.5mm-30mm
 
Length
 
1-12m or as per customer's requirement
 
Surface
 
Hot dipped galvanized, 20g-275g/m2
 

Standard
 
GB/T13793-1992,GB/T14291-2006, GB/T3091-1993,GB/T3092-1993,GB3640-88 BS1387/1985,ASTM A53/A36,EN39/EN10219,API 5L,GB/T9711.1-99 etc
 
Material
 
Q195-Grade B, SS330, SPC, S185 Q215-Grade C,CS Type B, SS330, SPHC Q235---Grade D, SS400, S235JR, S235JO, S235J2 Q345---SS500,ST52
 
Application
 
Widely used in structure, accessorize,construction, machinery parts,fluid transportation,the stress parts of the automobile tractor parts and so on.
 

Package
 
1) Big OD: in bulk;
2) Small OD: packed by steel strips;
3) Plastic bags;
4) According to customer's requirement.
 
Delivery time
 
within 7 working days after receiving the deposit
 

Advantage
 
1) Reasonable price with excellent quality;
2) Abundant stock and prompt delivery;
3) Rich supply and export experience, sincere service;
 
 
Quality Inspection

Hot Sale Customized Hot Cold Rolled Structural Mild Seamless Steel Pipe/Welded A53 A106 Pre Square/Round Galvanized Black Steel Pipe for Construction

Application area

Hot Sale Customized Hot Cold Rolled Structural Mild Seamless Steel Pipe/Welded A53 A106 Pre Square/Round Galvanized Black Steel Pipe for Construction

 

 


Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 7-10 days;
for products need new special and rare materials,usually need 15-20 days to make shipment.


Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.

Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.

Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.
Airline and sea shipping also optional.
For mass products, ship freight is prefered.


Q5. Can you accept customize?
A: Yes. It can be customized as per the customers' request.

Q6. How to ensure the quality?
A:Mill Test Certificate is supplied with shipment.
If needed, a Third Party Inspection is acceptable or SGS.
 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shandong Hongteng Fengda Metal Material Co, Ltd.
Location Room 1066, Office Building 3, Contemporary International, Dongchang East Road, Liaocheng Economic and Technological Development Zone, Shandong Province, China
Contact Person admin

Request A Quote

Please check your email address.
Your message must be at least 20 characters.