China CT Steelstructure Co.,Ltd
                                                                                                           
Verified Supplier
22 Years
Since 2004
Menu

Prefabricated Steel Structure Bridge Truss Construction For Railway Transportation

Price Negotiable
Price: 40-160USD/㎡
MOQ: 200㎡
Delivery Time: 21-40Days
Brand: CT Steel Structure
Product Description
Prefabricated Steel Structure Bridge Truss Construction For Railway Transportation
Product Specifications
Attribute Value
Name Prefabricated Steel Structure Bridge Truss Construction For Railway Transportation
Installation Online Guidance, Support Installation
Residential Wall Structure Wallboard
Customization Available
Type Steel Truss Bridge
Life Span Semi-Permanent Bridge
Material Steel Bridge
Origin China
Technical Details
Scale Large Bridge Surface Treatment Shot Blasting, Galvanized or Painted
Material Steel Bridge Lead Time 35-50 Days
Secondary Frame Tie Bar, Bracing, Diagonal Rod for Bridge Shot Blasting Standard SA2.0~2.5
Life Span Permanent Bridge Welding Continuous Weld Full Length
Cutting Plasma Cutting, CNC Cutting Transport Package Steel Pallet + Container
Pre-Assembly Pre-Assembly in Our Factory Installation Online Instruction
Specification L*W*H Size Customizable
Main Frame H Beam and Column, Lower Chord Brace
Construction Features
High-strength bolts and welding are the primary connection methods for steel bridges. The high-strength bolt connection offers simplicity in construction and detachability while ensuring reliable connections. This method is widely used in steel beam segment splicing and bridge-to-pier connections. During construction, precise control of bolt pre-tightening force ensures close fitting and effective load transmission.
Welding creates continuous, rigid connections essential for structural integrity. In critical areas like steel box girder welds, this method ensures seamless structural connections, reduces stress concentrations, and enhances overall structural performance.
Key Advantages
Fast Construction Speed: The combination of factory prefabrication and on-site assembly significantly reduces construction time compared to concrete bridges. Steel structure bridges eliminate lengthy concrete pouring and curing processes, enabling rapid component installation and immediate usability - particularly valuable for emergency disaster relief bridges or temporary construction bridges.
Railway Applications
Railway bridges demand exceptional structural rigidity and stability. Steel structure bridges excel in railway construction due to their high strength and superior mechanical properties. In high-speed rail construction, steel bridges meet stringent deformation control requirements for safe high-speed train operation. Many river-crossing and cross-sea high-speed rail bridges in China utilize steel structure designs to ensure safe, smooth train passage.
Product Images
Steel bridge truss construction in progress Completed steel truss bridge structure Detailed view of steel bridge connections
Packaging & Shipping
Steel bridge components packaged for shipping
Frequently Asked Questions
FAQ about steel bridge construction

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company China CT Steelstructure Co.,Ltd
Location No.5555,Xinglong East Road,Linqu County,Weifang City,Shandong Province,China
Contact Person David

Request A Quote

Please check your email address.
Your message must be at least 20 characters.