Online Guidance Steel Cable Bridge Semi Permanent Lightweight
Price:
40-160USD/㎡
MOQ:
200㎡
Delivery Time:
21-40Days
Brand:
CT Steel Structure
Product Description
Online Guidance Steel Cable Bridge Semi Permanent Lightweight
Product Specifications
| Attribute | Value |
|---|---|
| Name | Steel Truss Bridge |
| Installation | Online Guidance, Support Installation |
| Residential Wall Structure | Wallboard |
| Life | Semi-Permanent Bridge |
| Material | Steel Bridge |
| Weight | Light Weight |
| Stiffness | The Overall Stiffness Is Good |
Product Overview
Steel structural bridges play an indispensable role in modern transportation infrastructure with their excellent structural properties, efficient construction methods, and wide application fields. With continuous advancements in material technology and construction techniques, steel structural bridges demonstrate increasingly broad development prospects in future bridge construction.
Technical Parameters
| Scale | Large Bridge | Surface Treatment | Shot Blasting, Galvanized or Painted |
| Material | Steel Bridge | Lead Time | 35-50 Days |
| Secondary Frame | Tie Bar, Bracing, Diagonal Rod for Bridge | Shot Blasting Standard | SA2.0~2.5 |
| Life | Permanent Bridge | Welding | Continuous Weld Full Length |
| Cutting | Plasma Cutting, CNC Cutting | Transport Package | Steel Pallet + Container |
| Pre-Assembly | Pre-Assembly in Our Factory | Installation | Online Instruction |
| Specification | L*W*H | Size | Customizable |
| Main Frame | H Beam and Column, Lower Chord Brace |
Key Advantages
- Excellent Mechanical Properties: High elastic modulus with minimal deformation under stress ensures bridge rigidity and reduces vehicle vibration
- Superior Ductility: Absorbs energy through plastic deformation during extreme loads (earthquakes, strong winds), preventing brittle damage and enhancing earthquake/wind resistance
- Structural Integrity: Maintains stability and performance under various environmental conditions
Application Examples
Cross-river bridges like Shanghai Nanpu Bridge demonstrate the effectiveness of steel structure cable-stayed bridges. Connecting Pudong and Puxi, this vital transportation hub significantly alleviates cross-strait traffic pressure while promoting interregional exchange and development.
Product Gallery
Packaging & Shipping
Frequently Asked Questions
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
China CT Steelstructure Co.,Ltd
Location
No.5555,Xinglong East Road,Linqu County,Weifang City,Shandong Province,China
Contact Person
David