Xinxiang Better Smart Transport Equipment Co., Ltd.
                                                                                                           
Verified Supplier
11 Years
Since 2015-11-04
Menu

Heavy Duty 300-ton Load Capacity Battery-Powered Transfer Cart with Anti-Explosion and 360-Degree Rotation

Price Negotiable
Price: US$3000-3500
MOQ: 1 Piece
Delivery Time: 15-30 days
Brand: BETTER
Product Description
Heavy Duty Steel Pipes Transport Equipment Material Transfer Trolley
Product Overview

BWP series flatbed truck cart is a trackless material handling trolley designed to operate on cement floors without requiring rail installation. Equipped with at least two casters enabling 360-degree motorized rotation without floor damage, this battery-powered electric transfer trolley offers complete freedom from cable constraints.

The trolley features intuitive forward/backward movement and left/right turning controls via button operation and speed controller. Optional PLC control system is available for full automation integration.

Heavy duty transport equipment in industrial setting
Key Features
  • Low Noise Operation: Engineered for minimal noise levels during operation
  • Maximum Safety: Comprehensive safety guarantees for operators and handled materials
  • Easy Operation: User-friendly driving controls with immediate operational readiness
  • Easy Implementation: Operates on standard floors without complex or permanent installation requirements
  • Versatile Load Capacity: Suitable for both small and extremely large loads with modular fabrication supporting payloads up to 300 tons per trolley
Heavy duty transport trolley features demonstration
Product Demonstration
Heavy duty steel pipes transport equipment in use
Manufacturing Process
CNC Cutting

Steel plates are transported from raw material warehouse to CNC cutting workshop for precision cutting, followed by chip removal and layout processing.

Preliminary Assembling

Cut steel plates are assembled according to design specifications.

Welding

Automatic welding machines join steel plates after preliminary assembly.

Post Weld Treatment

Welding sections are tested, polished, deburred, and undergo stress elimination treatment.

Spray Primer

Processed structures are transported to painting booth for two-layer zinc-rich epoxy anti-rust primer application.

Assembling

Primer-coated structures are assembled with wheels, motors, gear boxes, and other components.

Paint Finish

Assembled carts undergo final paint application after primer integrity inspection.

Debugging

Complete carts are debugged with electric control systems, tested without load, then with load, and finally transported to storage after inspection.

Manufacturing process of heavy duty transport equipment
Product Specifications
Product Name Model Power Supply Mode Load Capacity Running Distance Usage
Rail Transfer Cart BDG Conductor Rail 1-300t (customized) ≤70m Ordinary goods (steel plate, workpiece, equipment) and special goods (coil, column, ladle)
Battery Powered Transfer Car BXC Battery Customized Unlimited Various industrial applications
Cable Powered Transfer Trolley BJT Cable Drum Customized ≤50m Industrial material handling
Electric Transfer Cart BTL Trailing Cable Customized ≤20m Factory floor transport
Busbar Powered Handling Cart BHX Busbar Customized Unlimited Heavy industrial applications
Towed Rail Trailer BP Towed by other machine Customized Unlimited Various towing applications
Steerable Towed Car BWT Manually or towed by forklift 1-150t Unlimited Cement or steel floor operations
Trackless Handling Machine BWP Battery Customized Unlimited Versatile industrial transport
Related Products
Other industrial transport equipment products
Packaging & Shipping

Industrial equipment shipping preparation
Secure shipping packaging for industrial equipment
Final packaged transport equipment ready for shipment

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Xinxiang Better Smart Transport Equipment Co., Ltd.
Location Internet Building, Northwest of Xinzhong Road and Jinsui Road, Hongqi District, Xinxiang, Henan
Contact Person Mike

Request A Quote

Please check your email address.
Your message must be at least 20 characters.