Shanghai Xiongji Material Co., Ltd. is an international private enterprise integrating domestic and international steel trade,processing and distribution,warehousing logistics, industry and investment. Established in 2002, Xiongcan Iron and Steel Co., Ltd.is the predecessor of Shanghai Xiong Ji Material Co., Ltd. located in Jiuxing Steel Market, Minhang District, Shanghai. And dedicated to steel trade wholesale, warehousing, processing and steel derivatives industry accessories procurement function services.Company specializes in selling PPGL,galvanized steel coil, steel sheet, stainless steel sheet.steel pipe seamless and welded, aluminum coil, angel bar,H steel beam, and deformed steel bar and other steel products.
The company has achieved good results with many well-known architectural units suchas China Railway Group, China Construction,Shanghai Architecture, Central Asia Architecture, Huasheng Building, Hongrun Building and Nantong Building. Cooperation.
Complete Specification Carbon Steel Hollow Tube Cutting Service Hot Rolled Seamless Round Carbon Steel Pipe
Price:
Negotiable
MOQ:
Negotiable
Delivery Time:
15-21 days
Product Description

Product Paramenters
Product Name: | Carbon Steel Pipe |
Out Diameter: | 15mm-914mm |
Wall Thickness: | 2mm-120mm |
Length: | As customer's actual requirement |
Standard: | American ASME B36.10M, ASTM, API 5L, API 5CT Japanese JIS,German DIN,Chinese GB,BS standard |
Main Material (Carbon Steel & Low Alloy steel): | ASTM A53, A106, A210, A252, A333 etc; X42, X46, X52, X60, X65, X70 etc; JIS STPG42, G3454, G3456 etc; German St37, St42, St45, St52, DIN1626, DIN17175 Chinese 20#, Q345, 16Mn etc |
Surface Treatments: | Painted, Oiled, galvanized, phosphate etc. |
Technique: | Cold Rolled,Hot Rolled(as custom's request). |
Processing Method: | Bending, Welding, Decoiling, Cutting, Punching. |
Special Specifications: | Available according to customer’s requirements and quantity. |
Packaging: | Standard seaworthy packaging or as customers’ requirements. |
End Shape: | Beveled end , plain end, varnished, or adding plastic caps to protect the two ends as per customer’s requirements. |
Delivery Time: | Within 10-20 working days after receipt the deposit payment. |
Usage: | 1.Widely used in the mechanical treatment field, petrochemical industry, transport and construction field 2.Ordinary structural purposes and mechanic structural purposes, for example in construction field, fulcrum bearing etc; 3.The transportation of fluids in the projects and big equipments, for example transport of water, oil, gas etc 4.Can be used in low and medium pressure boiler for the transportation of fluids, for example steam tube, big smoke tube, small smoke tube, generating tube etc. |


Products In Stock



Main Products
Carbon Steel Pipe Carbon Steel Coil/Plate Galvanized Steel Pipe Galvanized steel Coil
Aluminum Pipe/Tube Stainless Steel Pipe PPGI H&l-Beam
Company Profile

Campany Information

Certifications

Our Advantages

Packaging&Shipping







FAQ
Q: Are you a trading company or a manufacturer?
A: We are a combination of industry and trade,so our price is very competitive. Pls feel free to contact us if you are interested in our products.
A: We are a combination of industry and trade,so our price is very competitive. Pls feel free to contact us if you are interested in our products.
Q:Will you can accept the customized and OEM products?
A:Yes,we can do the production based on your drawings and with your logo,also because we have very strong design and development team,so the feedback is very good for customized product.
A:Yes,we can do the production based on your drawings and with your logo,also because we have very strong design and development team,so the feedback is very good for customized product.
Q:Does the product have quality inspection before loading?
A:Of course, all our products are strictly tested for quality before packaging, and unqualified products will be destroyed.we
accept the third party inspection absolutely.
A:Of course, all our products are strictly tested for quality before packaging, and unqualified products will be destroyed.we
accept the third party inspection absolutely.
Q: How long is your lead time?
A: Usually 5-10 days if the goods are in stock, or 10-20 days if the goods are not in stock (according to the quantity).
A: Usually 5-10 days if the goods are in stock, or 10-20 days if the goods are not in stock (according to the quantity).
Q: What are the terms of payment?
A: Deposit 100% or 30% in advance and make up the balance before shipment.
If you need other terms, please feel free to contact us too, we will try our best.
A: Deposit 100% or 30% in advance and make up the balance before shipment.
If you need other terms, please feel free to contact us too, we will try our best.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shanghai Xiongji Materials Co., Ltd.







