Shanghai Xiongji Materials Co., Ltd.
                                                                                                           
Verified Supplier
Years
Since
Menu

Wholesale Hot Galvanized Checkered Steel Plate Galvanized Hot Deep Galvanized Steel Plate Steel Plate

Price Negotiable
Price: Negotiable
MOQ: Negotiable
Delivery Time: 8-14 Days
Product Description
Standard
EN10346,JIS G3302 ASTM A653,AS 1397.GB/T 2518
Tolerance
±1%
Place of Origin
China

Shanghai
Delivery Time
Within 10-20 working days after receipt the deposit payment.

Main Material
Dx51D,Dx52D,Dx53D,DX54D.DX55D,DX56D,DX57D,S220GD.S250GD,S280GD,S320GD,S350GD,S390GD,S420GD.S450GDS550GD,SGHC,SGH340,SGH400,SGH440,SGH490.SGH540SGCC,SGCH,SGCD1.SGCD2
SGCD3,SGCD4.SGC340.SGC400SC440,SGC490,SGC570:CS-A,CS-B,Cs-C,Grade 33,grade 37.grade40,garde
50,grade60,grade70,grade80G1,G2,G3,G250,G300,G450G550 As Requirement
Technique:
Galvanized Coated
Thickness
0.12mm-6.0mm (as required)
Width
600-1800mm (as required)
Application
Industrial
Processing Service
Welding, Decoiling, Punching, Cutting, Bending
Product name
Galvanized Steel Plate
Special Specifications
Available according to customer's requirements and quantity.
Packing
Standard seaworthy packaging or as customers requirements.
Usage
Industrial panels,Roofing,Siding for painting,Building,Walls,Externaldecorating materials etc.
Q: Are you a trading company or a manufacturer?
A: we are A combination of industry and trade,so our price is very competitive. Pls feel free to contact us if you are interested in our products.
Q:Will you can accept the customized and OEM products?
A:Yes,we can do the production based on your drawings and with your logo,also because we have very strong design and development team,so the feedback is very good for customized product.

Q:Does the product have quality inspection before loading?
A:Of course, all our products are strictly tested for quality before packaging, and unqualified products will be destroyed.we accept the third party inspection absolutely.

Q: how long is your lead time?
A: usually 5-10 days if the goods are in stock, or 10-20 days if the goods are not in stock (according to the quantity).

Q: what are the terms of payment?
A: deposit 100% or 30% in advance and make up the balance before shipment.If you need other terms, please feel free to contact us too, we will try our best.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shanghai Xiongji Materials Co., Ltd.

Request A Quote

Please check your email address.
Your message must be at least 20 characters.