Iron Spring Hook for 1.5mm Wire Rope with Customized Size and Easy Installation for Lighting Suspension
Price:
1 dollars
MOQ:
200
Delivery Time:
7-10 work days
Brand:
meiyan
Product Description
Iron Spring Hook for 1.5mm Wire Rope
Professional iron spring hook designed specifically for 1.5mm wire rope applications in lighting and suspension systems.
| Material | Iron, stainless steel (Metal, Brass/Copper/Carbon Steel/Iron/Stainless Steel/Customized) |
|---|---|
| Application | Indoor, Outdoor, Panel Light/LED Strip Light/Plant Pot Hanging Light/Mining Light/Chandelier |
| Feature | Easy Installation, High-quality/Durable |
| Type | In Stock, Easy Installation |
| Product Name | Iron Spring Hook for 1.5mm Wire Rope |
| Color | Pearl Chrome/Nickel Plating/White/Black/Customized |
| Usage | Lighting Accessory |
| Keyword | Iron Spring Hook for 1.5mm Wire Rope |
| Function | Home/Hotel Indoor/Outdoor Lighting |
| Sample | Available |
| Size | Customized Size |
Strong Manufacturing & R&D Capabilities
- 10+ years of production and sales experience
- 2,000 m² factory floor with advanced production machinery and professional technicians
- Tensile Test Machine and Salt Spray Machine ensure our products meet safety standards
Diverse Product Range & High Customization
- Main products: cable gripper, steel wire ropes, safety cable, suspension kits, and other lighting hardware accessories
- Diversified selection includes track light accessories, ceiling roses, hooks, buckles, rings and more
- Customized service for color, specification, material, logo and package
Reliable Trade & Service Guarantees
- Trade Assurance protection covering refunds, on-time delivery, and after-sales support
- Exports to Europe, North America, the Middle East, Southeast Asia, etc.
- Average delivery time: 15 days; supports FOB, CIF, DDP terms
Frequently Asked Questions
Q1: Are you a trading company or factory?
A: We are 100% factory, we warmly welcome our customers to make a field visiting at any time.
Q2: Can I get free sample for specification confirmation before mass production?
A: Free sample available for existing dimension.
Q3: What about the lead time?
A: Sample needs 5-7 days, mass production time needs 1-2 weeks for order confirmation.
Q4: What tests do you do?
A: Tensile Test and Salt Spray Test.
Q5: How to proceed an order?
A: First, let us know your requirements or application. Second, We quote according to your requirements or our suggestions. Third, customer confirms the samples and places deposit for formal order. Fourth, We arrange the production.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Dongguan Meiyan Lighting Hardware Co., Ltd.
Location
No.2, Lujiazhou Third Road, Hengli Town, Dongguan City, Guangdong Province, China
Contact Person
Jiang