Qingdao Tsin Steel Structure Construction Technology Co.,Ltd.
                                                                                                           
Verified Supplier
6 Years
Since 2020
Menu

High Strength Framework Steel Structure Workshop Building Q355B H Section Beam

Price Negotiable
Price: USD 40-60 / sqm
MOQ: 1000 sqm
Delivery Time: 6 weeks after shop drawing get approval
Brand: TSIN
Product Description
High Strength Framework Steel Structure Workshop Building
Product Specifications
Attribute Value
Main Structure Portal Steel Frame
Beam Q355B H-section Beam
Processing Service Bending, Welding, Cutting, Punching
Service Life 50 Years
Design PKPM, CAD, Tekla Structures
Hs Code 9406900090
Blasting Sa2.5, St2.0
Surface Protection Hot dipped galvanized, paint
Product Overview

Our high-strength steel structure workshop buildings feature a load-bearing framework composed of beams, columns, and trusses. The complete system includes bracing components (tie bars, knee bracing, staying bars) along with roof, wall, and floor systems to form a durable, integrated structure.

Steel structure workshop building exterior Interior view of steel structure workshop
Technical Specifications
Dimension Length x Width x Eave height/Ridge height
Frame type Portal frame, multi-story frame
Main frame Hot-rolled or Welded H beam and column, Q355B steel
Bracing components Tie bar, staying bar, Horizontal bracing, Column bracing
Cladding system Corrugated color steel sheet, sandwich panel with glass wool, rock wool, PU insulation
Accessory Ridge tile, trim, Gutter, Down pipe, skylight, clerestory
Door Sliding door, Roll up door, industrial section door, swing door
Window PVC window, aluminum window, metal louver
Key Advantages
  • Easy Assembly: Prefabricated components arrive ready for quick installation following a systematic erection sequence
  • Cost-Effective: Lightweight design reduces foundation costs while fast construction enables quicker ROI
  • Rapid Construction: 4,000 sqm buildings can be installed in approximately 40 days
  • Eco-Friendly: Dry construction process minimizes environmental impact and construction waste
Steel structure construction process
Design Considerations

Optimal Column Spacing: We recommend 6.8m to 9m spacing for economic efficiency while accommodating special project requirements.

Ventilation & Lighting: Our designs incorporate strategic window placement and roof ventilators to ensure proper airflow and natural illumination.

Steel vs. Concrete Construction
  • 50-70% faster construction timeline
  • 20-30% lower total project costs
  • Reduced environmental impact with dry construction
  • Lighter structural weight with superior strength
  • Greater design flexibility and future adaptability

With nearly 20 years of experience, we've successfully completed hundreds of projects worldwide. Our engineering team provides complete solutions for:

  • Pre-Engineered Steel Buildings
  • Heavy Industry Facilities
  • Commodity Industry Structures
  • Custom Industrial Steel Frameworks

Contact us today for the optimal solution for your project requirements.

Completed steel structure workshop project

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Qingdao Tsin Steel Structure Construction Technology Co.,Ltd.
Location Room 709, Building 5, No. 176 Jufeng Road, Qingdao, Shandong, China
Contact Person Alice Lee

Request A Quote

Please check your email address.
Your message must be at least 20 characters.