JMD550 22inch Cutter Suction Dredger 900m³/h Capacity 3000m Discharge Distance
Price:
$500000-$800000
MOQ:
1 Set
Delivery Time:
30days
Brand:
Jin Meng
Product Description
Product Overview
The JMD550 Cutter Suction Dredger is available in self-propelled or non-self-propelled configurations with a portable design. The hull features a dismantle and box-like structure, allowing for easy assembly at the worksite and convenient transportation by road, railway, or container. The power system can be customized as either electric or diesel engine driven to meet specific project requirements.
Key Specifications
| Attribute | Value |
|---|---|
| Maximum Working Capacity | 900m³/h |
| Discharge Distance | 3000m |
| Dredging Depth | 14m |
| Discharge Diameter | Up to 1000mm |
| Cutter Power | Up to 200kW |
| Cutter Teeth Quantity | 40-60 Pieces |
| Total Power | 1662KW |
| Hull Dimensions | 42m × 7.5m × 2.0m |
Key Features
- Self-propelled or non-self-propelled configurations available
- Portable design with dismantle hull structure
- Cummins diesel engine and Stanford generator
- 5-6 cutter blades with 40-60 teeth pieces
- Front plate thickness: 5mm-20mm
- Diesel or electric power options
- Optional equipment: water flow meter, sounder depth meter
Technical Parameters
| Parameter | Specification |
|---|---|
| Model | JMD550 22inch Cutter Suction Dredger |
| Dredging Pump | Dia. Discharge pipe 550mm |
| Head | 65m |
| Diesel Engine | 1306KW Cummins |
| Hydraulic Auxiliary Engine | 336KW Cummins |
| Emergency Generator | 20KW WEICHAI |
| Oil Consumption | 250L/H |
Applications
- River and canal dredging for waterway maintenance and flood prevention
- Port and harbor maintenance to ensure safe navigation
- Land reclamation projects for creating new land areas
- Coastal protection and beach nourishment
- Underwater mining operations for mineral extraction
Customization Options
- Anchor booms installation
- Spud carriage configuration
- 5-anchor positioning system
- Hydraulic driving for spud flat down
- Additional underwater dredging pump for depths of 20-30m
- Booster station for extended discharge distance
Packaging & Shipping
The dredger components are securely packed in wooden crates with protective wrapping. Shipping is typically via sea freight with an estimated delivery time of 4-6 weeks.
Product Gallery
Manufacturing Facility
Production Workshop
Dredger in Workshop
Dredger in Operation
Operational View
Installation & Training
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Weifang Jin Meng Dredger Co., Ltd.
Location
Longshan Industrial Park, Linqu County, Weifang City, Shandong Province, China
Contact Person
Becky Lee