ISO9001 Certified CNC Turning Milling Parts with ±0.002~0.005mm Tolerance and 100% Inspection
Price:
0.1~5USD
MOQ:
I PC
Delivery Time:
7~35 working days
Brand:
IMission
Product Description
Precision CNC Turning Milling Auto Components
As an OEM manufacturer, we specialize in precision CNC turning and milling auto components with exceptional quality and reliability.
Product Specifications
| Product Name | CNC Turning Milling Parts |
| Material Available | Steel |
| Processing | CNC Turning Milling |
| Surface Finish | Black Oxidation |
| Tolerance | ±0.002~0.005mm |
| Drawing Accepted | IGES(igs), STEP(stp), SolidWorks (sodprt), PRT, AutoCad, or Samples |
| Inspection | CMM, Projector, Height Gauge, etc. |
| Lead Time | 7~35 working days |
| Quality Assurance | ISO9001:2015, SGS, RoHs |
| Payment Term | MoneyGram, Western Union, T/T, D/P, D/A, L/C |
| Price | According to your drawing or requirements |
Packaging and Delivery
| Packaging | Bubble and Carton or Customization |
| Port | Shenzhen |

CNC Turning Milling Parts Features
- One-step machining precision with minimal setup errors
- Support for complex geometries including both rotational and prismatic features
- Tight dimensional tolerances and smooth surface finishes
- Excellent batch consistency for fast-paced production demands
- Maintains high quality standards throughout production cycles
Target Industries & Applications
Aerospace & Defense
Components: Fasteners, fittings, bushings, spacers, hydraulic parts
Materials: Titanium, high-strength aluminum, corrosion-resistant steels
Standards: AS9100, NADCAP (supplemental), MIL specifications
Medical & Dental
Components: Surgical instruments, implantable components, device housings
Materials: 316L stainless, titanium, PEEK, cobalt-chrome
Requirements: Biocompatibility, cleanroom manufacturing, full traceability
Automotive & Motorsports
Components: Engine parts, transmission components, fuel system parts, fittings
Materials: Various steels, aluminum, brass, exotic alloys for racing
Capabilities: High-volume production, lean manufacturing, JIT delivery
Electronics & Semiconductor
Components: Connector pins, shielding components, heat sinks, spacers
Materials: Copper alloys, aluminum, conductive plastics
Precision Requirements: Often ±0.005mm or tighter, micron-level finishes
Fluid Power & Hydraulics
Components: Valve bodies, fittings, manifolds, pistons, cylinders
Materials: Carbon steel, stainless, brass, aluminum
Critical Aspects: Pressure integrity, sealing surfaces, thread quality

Design Support & Engineering Services
Design for Manufacturing (DFM) Analysis
- Manufacturability Review: Identification of potential production issues
- Cost Reduction Analysis: Alternative approaches, material optimization
- Tolerance Analysis: Statistical tolerance stacking, specification review
- Fixture/Tooling Design: Custom workholding solutions for complex parts
- Process Optimization: Sequencing, tool selection, cycle time reduction
CAD/CAM Capabilities
- CAD Software: SolidWorks, CATIA, UG/NX, Autodesk Inventor, AutoCAD
- CAM Software: Mastercam, HyperMILL, PowerMILL, CATIA, UG/NX
- Simulation: Virtual machining verification, collision detection, material removal simulation
- Reverse Engineering: 3D scanning (laser, structured light) to CAD model conversion
- Prototyping: Rapid prototyping support via 3D printing for design validation
Specialized Engineering Services
- Finite Element Analysis: Stress, thermal, modal analysis for component optimization
- Fluid Dynamics: Flow analysis for manifolds, fluid system components
- Thermal Analysis: Heat sink performance, thermal management solutions
- Drafting & Documentation: Creation of manufacturing drawings, GD&T application
Lead Time Guidelines
| Production Type | Standard Lead Time | Expedited Options | Factors Affecting Lead Time |
|---|---|---|---|
| Prototype (1-10 pcs) | 5-15 business days | 3-5 days (+30-50%) | Material availability, complexity, fixturing |
| Low Volume (10-100 pcs) | 10-25 business days | 5-10 days (+25-40%) | Tooling requirements, secondary operations |
| Medium Volume (100-1,000 pcs) | 3-5 weeks | 2-3 weeks (+20-35%) | Production scheduling, capacity |
| High Volume (1,000+ pcs) | 6-12 weeks | 4-8 weeks (+15-30%) | Material procurement, dedicated production runs |
| Large Parts (>1m dimension) | 4-10 weeks | 3-6 weeks (+25-50%) | Special handling, machine availability |
Packaging, Shipping & Logistics
Packaging Solutions
- Standard Packaging: Poly bags with desiccant in partitioned cartons
- ESD-Sensitive: Antistatic bags, conductive foam, static-dissipative containers
- Cleanroom Packaging: Double-bagged, cleanroom compatible materials
- VCI Protection: Volatile corrosion inhibitor papers/films for ferrous metals
- Custom Fixturing: CNC-machured foam inserts, custom racks, reusable containers
- International Shipping: Export-rated crates, climate-controlled options available
Logistics & Supply Chain
- Global Shipping: Relationships with major carriers (DHL, FedEx, UPS)
- Export Documentation: Commercial invoice, packing list, certificate of origin
- Compliance Documentation: Material certifications, RoHS/REACH declarations
- Inventory Management: Consignment stock, bonded warehousing, kanban systems
- Just-In-Time Delivery: Scheduled deliveries aligned with production schedules
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
iMission Industry Co.,Ltd
Location
Blcok#2, No.36-8 Yingtai Road, Langkou Community, Dalang Street, Longhua District Shenzhen
Contact Person
Mady Gong