XLC260 Second Hand Crawler Cranes 260 Tons XCMG Crawler Crane
Price:
200,000-6,000,000 RMB per unit
MOQ:
One Crane
Delivery Time:
According to Order Confirmation
Brand:
XCMG
Product Description
Heavy Machinery Second Hand Crawler Cranes 260 Tons 80km/H Travel Speed
260T Crawler Crane For Heavy Machinery Demolition
This high-capacity XLC260 crawler crane offers exceptional performance for demolition and heavy lifting operations at a competitive price point with guaranteed quality.
XLC260 Crawler Crane Technical Specifications
- Model: XLC260
- Max rated lifting capacity: 260t
- Max lifting moment: 1430t.m
- Main boom configuration: Features main boom hook with boom end pulley auxiliary hook (HBS/1)

Main Boom Performance Specifications (HBS/1 Configuration)
| Operating radius (m) | 23m | 26m | 29m | 32m | 35m | 38m | 41m | 44m | 47m | 50m | 53m |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 5.5 | 260 | ||||||||||
| 6 | 229.1 | 229.1 | 214.2 | ||||||||
| 7 | 189.4 | 189.4 | 189.2 | 189.3 | 183.9 | 172.9 | |||||
| 8 | 161 | 161 | 160.9 | 160.9 | 160.7 | 160.6 | 160.4 | 150.4 | |||
| 9 | 139.8 | 139.8 | 139.6 | 139.7 | 139.5 | 139.3 | 139.1 | 137.3 | 133.7 | 127.2 | 126.9 |
| 10 | 123.3 | 123.3 | 123.1 | 123.2 | 123 | 122.8 | 122.6 | 122.3 | 119.3 | 116.5 | 113.7 |
| 11 | 110.1 | 110.1 | 109.9 | 110 | 109.8 | 109.6 | 109.4 | 109.3 | 107.6 | 105.2 | 102.8 |
| 12 | 99.3 | 99.3 | 99.1 | 99.2 | 99 | 98.8 | 98.6 | 98.5 | 97.8 | 95.7 | 93.7 |
| 13 | 90.3 | 90.3 | 90.1 | 90.2 | 90 | 89.8 | 89.6 | 89.5 | 89.2 | 87.7 | 85.9 |
| 14 | 82.7 | 82.7 | 82.5 | 82.6 | 82.4 | 82.2 | 82 | 81.9 | 81.6 | 80.8 | 79.2 |
| 15 | 76.2 | 76.3 | 76.1 | 76.1 | 75.9 | 75.7 | 75.4 | 75.4 | 75.1 | 74.8 | 73.4 |
| 16 | 70.8 | 70.8 | 70.6 | 70.6 | 70.4 | 70.2 | 70 | 69.6 | 69.6 | 69.4 | 68.3 |
| 17 | 65.4 | 65.5 | 65.4 | 65.5 | 65.4 | 65.3 | 65.2 | 65.1 | 64.8 | 64.6 | 63.8 |
| 18 | 60.3 | 60.4 | 60.3 | 60.4 | 60.3 | 60.2 | 60.1 | 60 | 59.8 | 59.7 | 59.5 |
| 19 | 55.8 | 56 | 55.9 | 56 | 55.9 | 55.8 | 55.6 | 55.5 | 55.4 | 55.2 | 55 |
| 20 | 51.9 | 52 | 52 | 52.1 | 52 | 51.9 | 51.7 | 51.6 | 51.4 | 51.3 | 51.1 |
| 22 | 45.5 | 45.4 | 45.5 | 45.4 | 45.3 | 45.1 | 45 | 44.8 | 44.7 | 44.5 | |
| 24 | 40.1 | 40.1 | 40.2 | 40.1 | 40 | 39.8 | 39.7 | 39.5 | 39.4 | 39.1 | |
| 26 | 35.7 | 35.8 | 35.7 | 35.6 | 35.4 | 35.4 | 35.2 | 35 | 34.8 | ||
| 28 | 32.2 | 32 | 32 | 31.8 | 31.7 | 31.5 | 31.3 | 31.1 | |||
| 30 | 28.9 | 28.8 | 28.7 | 28.6 | 28.4 | 28.2 | 28 | ||||
| 32 | 26.2 | 26.2 | 26 | 25.9 | 25.7 | 25.5 | 25.3 | ||||
| 34 | 23.8 | 23.6 | 23.6 | 23.4 | 23.2 | 23 | |||||
| 36 | 21.6 | 21.5 | 21.3 | 21.1 | 20.9 | ||||||
| 38 | 19.7 | 19.5 | 19.3 | 19.1 | |||||||
| 40 | 18.1 | 17.9 | 17.7 | 17.5 | |||||||
| 42 | 16.4 | 16.2 | 16 | ||||||||
| 44 | 14.9 | 14.7 | |||||||||
| 46 | 13.5 |
Magnification Ratios
24 | 22 | 20 | 18 | 16 | 15 | 14 | 13 | 12 | 11 | 10
Important Notes:
1. The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.
2. The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.
3. The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.
4. The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.
5. The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shandong Tengfei Hoisting Engineering Co., Ltd.
Location
Steel Market in Huantai County, Zibo City, Shandong Province, China
Contact Person
Gong