Hydraulic 220T Used Crawler Crane For Emergency Rescue Work
Price:
200,000-6,000,000 RMB per unit
MOQ:
One Crane
Delivery Time:
According to Order Confirmation
Brand:
XCMG
Product Description
Hydraulic 220T Used Crawler Crane For Emergency Rescue Work 1239t.M Lifting Moment
220T Crawler Crane Can Be Used For Different Types Of Projects
This versatile crawler crane is designed for construction industry applications, oil industry operations, and emergency rescue work, providing reliable lifting solutions across various project types.
XLC220 Crawler Crane Technical Specifications
- Crawler crane models: XLC220
- Max rated lifting capacity: 220t
- Max lifting moment: 1239t.m
Typical Working Conditions
Main boom working condition - main boom main hook characteristics without arm end pulley (HB/1)
Main boom working condition - working range of main boom and main hook without arm end pulley (HB/1)
No arm end pulley HB/1 - 75t+21t main boom main hook performance
| Operating radius (m) | 20 | 23 | 26 | 29 | 32 | 35 | 38 | 41 | 44 | 47 | 50 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 5 | 220.0 | ||||||||||
| 6 | 196.0 | 195.5 | 193.5 | 179.5 | |||||||
| 7 | 177.0 | 176.0 | 174.5 | 173.5 | 167.9 | 156.1 | 144.2 | ||||
| 8 | 154.5 | 154.0 | 153.5 | 151.9 | 147.3 | 144.7 | 138.2 | 127.2 | 115.3 | 111.2 | |
| 9 | 136.8 | 136.0 | 135.2 | 133.4 | 132.5 | 129.2 | 126.0 | 122.9 | 115.3 | 111.2 | 107.2 |
| 10 | 116.7 | 117.1 | 117.4 | 117.5 | 116.6 | 114.0 | 111.4 | 108.9 | 106.5 | 103.2 | 102.0 |
Important Notes:
- The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.
- The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.
- The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.
- The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.
- The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 71m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 74m.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shandong Tengfei Hoisting Engineering Co., Ltd.
Location
Steel Market in Huantai County, Zibo City, Shandong Province, China
Contact Person
Gong