Shandong Zhuowang Waterproof Materials Co., Ltd.
                                                                                                           
Verified Supplier
6 Years
Since 2020
Menu

Non Asphalt Based Self Adhesive Hdpe Waterproofing Membrane Skin Type For Trench Bottom Slabs

Price Negotiable
Price: Negotiate the price
MOQ: 1000 square meters
Delivery Time: Delivery within 30 days
Brand: QILUZHUOWANG
Product Description
Non-Asphalt-Based Self-Adhesive Membrane Waterproofing Membrane - HDPE Waterproof Board, Skin-Type Waterproofing for Trench Bottom Slabs
HDPE Waterproof Board, Skin-Type Waterproofing for Trench Bottom Slabs
Product Introduction

HDPE Non-Asphalt-Based Self-Adhesive Membrane Waterproofing Membrane is a specialized waterproof material developed for pre-laid building waterproofing applications. Composed of polymer sheet, polymer self-adhesive membrane, and anti-adhesive layer, this non-asphalt-based polymer pre-laid waterproofing membrane is designed to integrate seamlessly with concrete structures.

Key Specifications
  • Thickness: 1.2mm, 1.5mm
  • Width: 1000mm, 2000mm
  • Waterproof Category: Polymer Type
  • Application Fields: Bottom Slabs, Trenches
  • Brand: Qilu Zhuowang
  • Origin: Weifang, Shandong
  • Feature: Pre-Laid Bonding
  • Shape: Rolled Sheet
  • Product Material: HDPE (High-Density Polyethylene)
Performance Characteristics

Under pressure, the polymer self-adhesive membrane and unset cement slurry in concrete creep and penetrate the anti-adhesive layer, forming effective mutual bonding with strong intermolecular forces. After concrete curing, the gaps between the polymer pre-laid waterproofing membrane and the main structure are permanently sealed, eliminating water channeling paths.

Applications
  • Waterproofing of basements, subways, tunnels and other underground structures
  • Projects with high waterproofing requirements
  • Green roof waterproofing systems
  • Gas leakage prevention for underground gas and biogas containment
Product Advantages
  • Superior pre-laid bonding performance
  • Reliable adhesion with easy maintenance
  • Low base layer requirements, reducing construction time
  • Excellent cost-performance ratio
Construction Process
  1. Clean the base layer thoroughly
  2. Snap layout lines on the base layer
  3. Lay the waterproofing membrane
  4. Properly lap the membrane joints
  5. Handle detailed connection nodes
  6. Conduct self-inspection, repairs and final acceptance
  7. Tie steel reinforcement bars
  8. Pour concrete structure
HDPE Waterproof Membrane installation process
Product Information
Item Content
Origin Shandong
Brand Name Qilu Zhuowang
Certification MA, CNAS
Model Type P
Commercial Terms
Item Content
Minimum Order Quantity 3000㎡
Price To be negotiated
Packaging Wooden Pallet
Delivery Time 30 Days
Payment Terms Full Payment Before Shipment
Supply Capacity 3000 Square Meters Per Day

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shandong Zhuowang Waterproof Materials Co., Ltd.
Location Taitou Industrial Park, Shouguang City, Weifang City, Shandong Province
Contact Person Yuki

Request A Quote

Please check your email address.
Your message must be at least 20 characters.