Fireproof Steel Frame Bridge Durable Steel Bridge Construction Recyclable
Price:
USD 25-100 per square meter/Negotiable
MOQ:
100 square meters
Delivery Time:
25-55 days
Product Description
Product Overview
This fireproof steel frame bridge is a durable steel bridge construction built from high-strength steel with hot-dip galvanization for corrosion protection. Featuring recyclable materials and a durability of 50+ years with maintenance, it offers customization options for dimensions and load specifications, with installation typically completed in 4 to 12 weeks depending on size.
Specifications
| Attribute | Value |
|---|---|
| Customizationoptions | Available For Dimensions And Load Specifications |
| Fire resistance | Fireproof Coatings Available |
| Installation time | 4 To 12 Weeks Depending On Size |
| Environmental impact | Recyclable Materials Used |
| Maintenance requirement | Low To Moderate |
| Corrosion protection | Hot-dip Galvanization |
| Material | High-strength Steel |
| Name | Steel Frame Bridge |
| Durability | 50+ Years With Maintenance |
Application Scenarios
- Pedestrian and vehicle bridges
- Industrial access bridges
- Municipal infrastructure
- Custom steel frame bridges
Key Advantages
- Fireproof coatings available
- Hot-dip galvanization for corrosion protection
- 50+ years durability with maintenance
- Recyclable materials used
- Customizable dimensions and load specifications
FAQ
Q1: How long does the bridge last?
A: 50+ years with maintenance.
Q2: What corrosion protection is applied?
A: Hot-dip galvanization.
Q3: How long does installation take?
A: 4 to 12 weeks depending on size.
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Changzhou Feiang Technology Co., Ltd
Location
Xiaoshan District, Hangzhou City, Zhejiang Province, China
Contact Person
bruce