Guangzhou Baizhuang New Material Co., Ltd.
                                                                                                           
Verified Supplier
17 Years
Since 2009
Menu

Fast-Curing PU Encapsulant for High-Throughput Power Electronics 6806-6-3R

Price Negotiable
Price: Negotiable
MOQ: 200KG
Delivery Time: 7 working days after payment
Brand: BZ-Bai Zhuang
Product Description

BZ-6806-6-3R is a two-component polyurethane encapsulant engineered for rapid insulation, sealing, and moisture protection in power supplies, industrial controllers, power tool PCBs, and EV converters. Featuring UL94 V-0 rating, fast cure, and enhanced thermal conductivity, it boosts production efficiency while meeting stringent safety standards. RoHS-compliant, it operates reliably from -40°C to 120°C, with water absorption ≤0.5% for long-term high-power durability.

Key Product Features

  1. Flame-Retardant Certified: UL94 V-0 rating effectively inhibits flame spread in critical assemblies.
  2. Ultra-Fast Cure: Cures in 2–6 hrs at 25°C, or ≤20 min at 60°C—ideal for high-volume production.
  3. Simple Metering: 1:5 weight ratio minimizes waste and works seamlessly with automated dispensing systems.
  4. Thermally Conductive: ≥0.50 W/m·K thermal conductivity for efficient heat dissipation and extended component life.
  5. High Dielectric Strength: Breakdown voltage ≥15 kV/mm; surface resistivity ≥1.0×10¹¹ Ω/sq.
  6. Vibration-Damping Flexibility: Shore A 73±10, absorbing mechanical shock and thermal expansion.
  7. Globally Accepted: Meets RoHS and UL94 V-0, simplifying international compliance.

Technical Parameters 

Parameters

Hardener

BZ-6806-6-3R A

Resin

BZ-6806-6-3R B

 

Before curing

Appearance

Brown liquid

Black liquid

Viscosity(mPa·s.25℃)

400±150

12000±5000

Initial mixed viscosity(mPa·s.25℃)

2800±800

Density(g/cm³.25℃)

1.20±0.05

1.65±0.05

 

Mixing

&

Curing

 

 

Mix ratio(by weight)

A:B=1:5

Pot life 130±30g(min.25℃)

10-60

(Adjustable for process/temperature )

Curing condition

Room temperature curing

Surface drying time 30g(H.25℃)

0.5-2

(Adjustable for process/temperature )

Curing time 30g(H.25℃)

2-6

(Adjustable for process/temperature )

Curing time(Heated)

60℃ heated 20 min

 

 

After curing

 

Color

Black

Hardness (Shore A)

73±10

Temperature resistance(℃)

-40~120

Flame retardancy UL94

 

V0

Thermal conductivity(W/m.k)

≥0.50

Water absorption(24H)

0.5%

Surface resistivity(Ω/sq)

≥1.0×1011

Volume resistivity(Ω.cm)

≥1.0×1010

Tensile strength(MPa)

≥2

Dielectric constant(at 50Hz)

4

Breakdown voltage(kV/mm)

≥15



Product Applications

1.High-Volume Power Supplies: Encapsulates consumer chargers, industrial inverters, and server power units for high-speed production lines.
2.New Energy Vehicle Components: Insulates BMS, on-board chargers, and DC-DC converters, withstanding extreme temperatures and vibration.
3.Industrial Controllers: Seals PLCs, motor drives, and power tool boards against dust, moisture, and harsh factory conditions.
4.Renewable Energy Systems: Protects solar inverters and wind turbine controllers, ensuring long-term outdoor reliability with fire-safe design.
5.Telecommunications Infrastructure: Encapsulates base station power modules and signal processors, enhancing durability in telecom cabinets.


Directions for Use

  1. Pre-potting Preparation: Calibrate scales, prepare potting tools, cleaning tools, check machine settings, check vacuum pump force, etc. 
  2. Product Pre-treatment: Place product on a level surface or fixture. Remove dust, clean, degrease, and dry if necessary.
  3. Accurate Proportioning: Manual operation requires precise mixing according to the specified ratio and recording. Machine potting requires calibrated ratios and first-article confirmation is recommended.
  4. Mixing & Stirring: Manual operation requires thorough stirring or using electric stirrers to ensure homogeneous mixing. Machine potting requires sufficient stirring speed, adjust as needed.
  5. Uniform Potting: Manual operation should be done in small, multiple batches to ensure uniformity. Machine potting should follow the programmed path for quantitative dispensing.
  6. Inspection or Secondary Potting: After potting, visually inspect as needed. Perform touch-up, bubble removal, or secondary potting if required.
  7. Curing: Allow the potted and inspected products to cure at room temperature or with heat assistance (recommended 60°C if needed), according to product and process requirements.
  8. Final Product Confirmation: Perform visual inspection and performance testing as required by the customer.


Packing

  1. Hardener: Typically 5KG/10KG/25KG/200KG metal or plastic drums.
  2. Resin: Typically 25KG/200KG metal or plastic drums.

    Conductivity Thermal Potting Compound Silicone For Transformer ODM BZ-3900-N1.5 1

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Baizhuang New Material Co., Ltd.
Location No. 8, Shangwei East Road, Shangtang Village, Shitan Town, Zengcheng District, Guangzhou City, Guangdong Province
Contact Person Sales

Request A Quote

Please check your email address.
Your message must be at least 20 characters.