D400 EN124 Standard 700x700x100mm Round Ductile Iron Manhole Cover for Heavy Duty Urban Roads
Price:
$50-90/t
MOQ:
10 tons
Delivery Time:
45 days
Brand:
SND Foundry
Product Description
D400 EN124 Standard Round Ductile Iron Manhole Cover
Product Overview
This heavy-duty 700×700×100mm round ductile iron manhole cover is engineered for demanding urban road applications. Certified to European Standard EN124 with D400 pressure rating, it delivers exceptional durability and load-bearing capacity for municipal and industrial infrastructure.
Key Specifications
| Dimension | 700×700×100mm |
|---|---|
| Pressure Rating | D400 (EN124 Standard) |
| Material | Ductile Cast Iron |
| Application | Heavy-Duty Urban Roads, Municipal Infrastructure |
Professional Installation Guidelines
Construction Preparation
- Materials Required: D400 round cast iron manhole cover, manhole ring, C25+ grade concrete, reinforcement bars, level, vibrator, cutter, wrench
- Site Survey: Verify well opening dimensions, clear debris, check wellbore flatness and verticality
- Foundation Preparation: For soft foundations, use graded gravel with medium coarse sand (compaction density ≥95%)
Foundation Treatment & Frame Installation
- Frame Positioning: Align frame edges with well opening, maintain level within ≤2mm tolerance
- Concrete Pouring: C25 concrete with minimum width of 300mm and thickness of 150mm around frame
- Anchor Bars: Use U-shaped or L-shaped threaded bars (diameter ≥12mm) in frame reserved holes
- Elevation Control: Implement cross-method measurement for precise road surface alignment
Cover Installation & Fixation
- Placement Timing: Install after concrete curing (minimum 7 days)
- Fit Requirements: Ensure proper fit without gaps between cover and frame
- Security Measures: Tighten bolts or install special locks to prevent movement and theft
Final Inspection & Acceptance
- Water-Tight Testing: For rainwater/sewage wells, test at upstream pipe top + 2m head (seepage ≤0.0046×D)
- Pavement Restoration: Match surrounding surface (asphalt or concrete) for smooth transition
- Final Verification: Confirm no looseness, abnormal sounds, and proper load-bearing capacity
Important Note: Installation requirements may vary for soft foundations and heavy-load industrial areas. Always follow project specifications and engineering drawings.
Contact us for special pricing - Available 24/7 for inquiries and orders.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Handan Shengnada New Material Technology Co., Ltd.
Location
No.4 Building, Wuan industry park, Handan City, Hebei, China
Contact Person
Andy