Guangzhou Pinxin Engine Co., Ltd.
                                                                                                           
Verified Supplier
7 Years
Since 2019-07-01
Menu

CAT 3406 Excavator Engine Cooler with Copper Heat Dissipation Core and High-Strength Steel Flange

Price Negotiable
Price: USA$
MOQ: 1pcs
Delivery Time: 1-15 work days
Brand: CAT
Product Description

Construction machinery For 1W-6990 1W6990 Cooler  CAT 3406 Excavator Engine Parts



Specification


Brand Name For CAT
Place of Origin China
Product Cooler
Part Number
1W-6990 1W6990
Type 3406
Payment T/T, L/C, MoneyGram, PayPal, Cash
MOQ 1 PCS
Packaging Neutral packing or meet customer's requirement.



Description


The 1W-6990 (1W6990) Cooler (Aftercooler/Intercooler) is a core heat exchange component of the turbocharged intake system, specifically designed for CAT 3406 series excavator engines in construction machinery. Featuring a tube-fin structure with a copper heat dissipation core and high-strength steel mounting flange, it meets OE-standard dimensions to ensure precise fit and seamless integration with the engine system. As a charge air cooling device, it reduces the high temperature of compressed intake air from the turbocharger, increases air density, provides sufficient oxygen for combustion, optimizes engine efficiency, and lowers thermal load to maintain stable engine operation under high-load conditions.



Advantage


OE-level Fitment: Strictly compliant with original design specifications, with perfectly matching hole positions, dimensions, and interfaces for CAT 3406 engines, enabling easy installation without modification.
High-efficiency Heat Dissipation: Copper core with dense fin design delivers excellent heat exchange efficiency, rapidly lowering intake air temperature and improving engine power response.
Durable Construction: High-strength welding process paired with a corrosion-resistant housing withstands vibration, impact, and harsh working conditions in construction machinery, ensuring long service life.
Optimized Engine Performance: Effectively suppresses detonation risks caused by high intake temperatures, reduces engine thermal load, minimizes failure probability, and extends the engine overhaul cycle.



Performance


Efficient Heat Exchange: Significantly reduces turbocharged intake air temperature, increases oxygen content in intake air, enables more complete combustion, and ensures stable power output.
Reliable Performance Under Harsh Conditions: Maintains consistent cooling efficiency even in high-load, high-temperature construction machinery operating environments, preventing power degradation and increased fuel consumption caused by overheated intake air.
Impact Resistance and Sealing: Precision welding guarantees leak-proof sealing while withstanding continuous engine vibration, with no performance degradation during long-term operation.
Easy Maintenance: Modular design facilitates later inspection and cleaning, reducing maintenance costs and adapting to the long-term high-intensity operation requirements of construction machinery.



FAQ


Q1: When will my goods be shipped?
A: Your goods will be dispatched within 24 hours after payment confirmation.


Q2: What is the lead time?
A: We maintain sufficient stock for immediate fulfillment.


Q3: What shipping methods do you offer?
A: We ship via sea, air, or express (DHL, FedEx, TNT, UPS, EMS).


Q4: What is the delivery time?
A: Stock items take 2 to 5 days; pre-order items take 7 to 15 days. Contact us for specifics.


Q5: How can I track my shipment?
A: We will provide you with the tracking number as soon as your order is shipped.



About us





Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Pinxin Engine Co., Ltd.
Location 广州市白云区大源街锦石三路33号之七三7楼D122
Contact Person John

Request A Quote

Please check your email address.
Your message must be at least 20 characters.