Foshan Wayen New Material Technology Co., Ltd.
                                                                                                           
Verified Supplier
3 Years
Since 2023
Menu

Factory Price Customized Water Based Paint High Adhesion Seepage-proofing Self-Brushing Waterproof Coating

Price Negotiable
Price: USD1.8/kg
MOQ: 100KG
Delivery Time: 5-8 working days
Brand: Wayen
Product Description
Water Based Rooftop Elastic Waterproofing Coating
Factory Price Customized High Adhesion Seepage-proofing Self-Brushing Paints
Water Based Waterproofing Coating Product Overview
Product Specifications
Place of Origin Guangdong, China
Main Raw Material Acrylic
Usage Building Coating, Roof, Terrace, Rooftop, Balcony
Model Number WF-200
Brand Name WAYEN
Application Method Brush
Other Names Water Based Rooftop Waterproof Sealants
State Liquid Coating
Application Waterproofing Renovation of New and Old Building Roofs
Shelf life 12 Months
Storage 5℃-35℃ cool and ventilated place
Product Features
Waterproofing Coating Application Demonstration Coating Performance Characteristics Waterproofing Coating Technical Details Coating Application Process Finished Waterproofing Results
Application Fields
  • Waterproofing for various materials such as concrete, metal, and asphalt for roofing
  • Waterproofing for factory roofs of light steel structures
  • Maintenance and renovation of old roof waterproof layers
  • Waterproofing for outdoor platforms such as balconies, patios, and rooftops
  • Waterproofing projects for the roof top plates of underground garages and planting roofs
  • Waterproofing treatment for building expansion joints and pipe roots and other detailed nodes
Construction Process
Construction Preparation
Base surface treatment: Clean the base layer to ensure there is no oil, dust, or loose debris. Sharp protrusions need to be smoothed out, and cracks and holes need to be filled with repair mortar.
Base surface requirements: Solid and flat, without standing water, but damp base surfaces are allowed for construction.
Environmental conditions: Construction temperature ranges from 5°C to 35°C, relative humidity should be less than or equal to 85%. Construction is not advisable on rainy or windy days.
Construction Steps
Detailed Processing: Pre-treat the roof pipe joints, corners, eaves and other areas with paint, and then lay additional reinforcing mesh fabric. A V-shaped groove is made at the cracks, and after filling with sealing material, a reinforcing layer is applied.
Painting: The construction is carried out using the "crossing" method to ensure uniform coating. After the first coat is applied, let it dry (about 4 hours) before applying the second coat. It is recommended to apply 2 coats, with a total thickness of no less than 1.5mm. The usage amount per square meter is approximately 1.0 - 1.5kg (depending on the base layer condition and coating thickness).
Maintenance and Protection: After the construction is completed, allow it to cure naturally for 24 hours. Avoid stepping on it and do not flush it with water. If personnel are needed, it is recommended to carry out the operation 72 hours after the construction is completed.
Construction Tools
Drum, brush, spraying equipment, blender, measuring tools, protective equipment
Company Profile
WAYEN Company Overview and Facilities

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Foshan Wayen New Material Technology Co., Ltd.
Location Room 501, Building 9, Wanyang Innovation City, No. 83, Zhanlun Road, Honggang Community, Shunde District, Foshan City, Guangdong Province, 528300 China.
Contact Person Sivvy Leung

Request A Quote

Please check your email address.
Your message must be at least 20 characters.