Customized Weather-resistant Color-change Anti-crack Waterproof Paint for Roofing Renovation
Price:
USD1.8/kg
MOQ:
100KG
Delivery Time:
5-8 working days
Brand:
WAYEN
Product Description
Customized Water-based Elastic Waterproof Roofing Renovation Paint
Weather-resistant color-change anti-crack coating designed for rooftop applications, providing superior waterproofing protection and durability.
Product Specifications
| Place of Origin | Guangdong, China |
| Main Raw Material | Acrylic |
| Usage | Building Coating, Roof, Terrace, Rooftop, Balcony |
| Model Number | WF-200 |
| Brand Name | WAYEN |
| Application Method | Brush |
| Other Names | Water Based Rooftop Waterproof Sealants |
| State | Liquid Coating |
| Application | Waterproofing Renovation of New and Old Building Roofs |
| Shelf Life | 12 Months |
| Storage | 5℃-35℃ cool and ventilated place |
Product Features
Application Fields
- Waterproofing for various materials including concrete, metal, and asphalt roofing
- Waterproofing for factory roofs of light steel structures
- Maintenance and renovation of old roof waterproof layers
- Waterproofing for outdoor platforms such as balconies, patios, and rooftops
- Waterproofing projects for roof top plates of underground garages and planting roofs
- Waterproofing treatment for building expansion joints, pipe roots, and other detailed nodes
Construction Process
Construction Preparation
Base Surface Treatment: Clean the base layer to ensure no oil, dust, or loose debris. Smooth out sharp protrusions and fill cracks and holes with repair mortar.
Base Surface Requirements: Solid and flat, without standing water, but damp base surfaces are allowed for construction.
Environmental Conditions: Construction temperature ranges from 5°C to 35°C, relative humidity should be ≤85%. Construction is not advisable on rainy or windy days.
Construction Steps
Detailed Processing: Pre-treat roof pipe joints, corners, eaves and other areas with paint, then lay additional reinforcing mesh fabric. Create V-shaped grooves at cracks, fill with sealing material, and apply reinforcing layer.
Painting: Apply using the "crossing" method to ensure uniform coating. After first coat dries (approximately 4 hours), apply second coat. Recommended: 2 coats with total thickness ≥1.5mm. Usage: approximately 1.0-1.5kg per square meter (depending on base layer condition and coating thickness).
Maintenance and Protection: Allow natural curing for 24 hours after completion. Avoid stepping on surface and do not flush with water. If personnel access is needed, wait 72 hours after construction.
Construction Tools
Drum, brush, spraying equipment, blender, measuring tools, protective equipment
Company Profile
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Foshan Wayen New Material Technology Co., Ltd.
Location
Room 501, Building 9, Wanyang Innovation City, No. 83, Zhanlun Road, Honggang Community, Shunde District, Foshan City, Guangdong Province, 528300 China.
Contact Person
Sivvy Leung