WF-200 Water-based Elastic Waterproof Roofing Coating with High Flexibility Strong Durability and Eco-friendly Properties
Price:
USD1.8/kg
MOQ:
100KG
Delivery Time:
5-8 working days
Brand:
WAYEN
Product Description
WF-200 Water-based Elastic Waterproof Roofing Coating
High flexibility, strong durability, and eco-friendly roof waterproofing paint designed for superior protection.
Product Specifications
| Place of Origin | Guangdong, China |
| Main Raw Material | Acrylic |
| Usage | Building Coating, Roof, Terrace, Rooftop, Balcony |
| Model Number | WF-200 |
| Brand Name | WAYEN |
| Application Method | Brush |
| Other Names | Water Based Rooftop Waterproof Sealants |
| State | Liquid Coating |
| Application | Waterproofing Renovation of New and Old Building Roofs |
| Shelf Life | 12 Months |
| Storage | 5℃-35℃ cool and ventilated place |
Product Features
Application Fields
- Waterproofing for various materials including concrete, metal, and asphalt roofing
- Waterproofing for factory roofs of light steel structures
- Maintenance and renovation of old roof waterproof layers
- Waterproofing for outdoor platforms such as balconies, patios, and rooftops
- Waterproofing projects for underground garage roof top plates and planting roofs
- Waterproofing treatment for building expansion joints, pipe roots, and detailed nodes
Construction Process
Construction Preparation
- Base surface treatment: Clean the base layer to remove oil, dust, and loose debris. Smooth sharp protrusions and fill cracks and holes with repair mortar
- Base surface requirements: Solid and flat surface without standing water (damp surfaces allowed for construction)
- Environmental conditions: Temperature range 5°C to 35°C, relative humidity ≤85%. Avoid construction on rainy or windy days
Construction Steps
Detailed Processing
- Pre-treat roof pipe joints, corners, eaves, and other areas with paint, then lay additional reinforcing mesh fabric
- Create V-shaped grooves at cracks, fill with sealing material, and apply reinforcing layer
Painting
- Apply using "crossing" method to ensure uniform coating
- Allow first coat to dry (approximately 4 hours) before applying second coat
- Recommended: 2 coats with total thickness ≥1.5mm
- Usage: Approximately 1.0-1.5kg per square meter (depending on base layer condition and coating thickness)
Maintenance and Protection
- Allow natural curing for 24 hours after construction
- Avoid stepping on surface and water flushing
- For personnel access, wait 72 hours after construction completion
Construction Tools
- Drum, brush, spraying equipment
- Blender, measuring tools, protective equipment
Company Profile
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Foshan Wayen New Material Technology Co., Ltd.
Location
Room 501, Building 9, Wanyang Innovation City, No. 83, Zhanlun Road, Honggang Community, Shunde District, Foshan City, Guangdong Province, 528300 China.
Contact Person
Sivvy Leung