WF-200 Waterproof Paint and Roof Coating with High Flexibility Crack Resistance and UV-resistant Properties for Roof Waterproofing
Price:
USD1.8/kg
MOQ:
100KG
Delivery Time:
5-8 working days
Brand:
Wayen
Product Description
WF-200 Water-based Elastic Waterproof Roofing Coating
High flexibility crack resistance UV-resistant eco-friendly roof paint designed for superior waterproofing performance.
Product Specifications
| Place of Origin | Guangdong, China |
| Main Raw Material | Acrylic |
| Usage | Building Coating, Roof, Terrace, Rooftop, Balcony |
| Model Number | WF-200 |
| Brand Name | WAYEN |
| Application Method | Brush |
| Other Names | Water Based Rooftop Waterproof Sealants |
| State | Liquid Coating |
| Application | Waterproofing Renovation of New and Old Building Roofs |
| Shelf Life | 12 Months |
| Storage | 5℃-35℃ cool and ventilated place |
Product Features
Application Fields
- Waterproofing for various materials including concrete, metal, and asphalt roofing
- Waterproofing for factory roofs of light steel structures
- Maintenance and renovation of old roof waterproof layers
- Waterproofing for outdoor platforms including balconies, patios, and rooftops
- Waterproofing projects for underground garage roof top plates and planting roofs
- Waterproofing treatment for building expansion joints, pipe roots, and other detailed nodes
Construction Process
Construction Preparation
Base surface treatment: Clean the base layer to remove oil, dust, and loose debris. Smooth sharp protrusions and fill cracks and holes with repair mortar.
Base surface requirements: Solid and flat surface without standing water. Damp base surfaces are acceptable for construction.
Environmental conditions: Construction temperature range 5°C to 35°C, relative humidity ≤85%. Avoid construction on rainy or windy days.
Construction Steps
Detailed Processing: Pre-treat roof pipe joints, corners, eaves and other areas with paint, then lay additional reinforcing mesh fabric. Create V-shaped grooves at cracks, fill with sealing material, and apply reinforcing layer.
Painting: Apply using the "crossing" method to ensure uniform coating. Allow first coat to dry (approximately 4 hours) before applying second coat. Recommended: 2 coats with total thickness ≥1.5mm. Usage: 1.0-1.5kg per square meter (depending on base condition and coating thickness).
Maintenance and Protection: Allow natural curing for 24 hours after completion. Avoid stepping on surface and do not flush with water. If personnel access is needed, wait 72 hours after construction.
Construction Tools
Drum, brush, spraying equipment, blender, measuring tools, and protective equipment.
Company Profile
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Foshan Wayen New Material Technology Co., Ltd.
Location
Room 501, Building 9, Wanyang Innovation City, No. 83, Zhanlun Road, Honggang Community, Shunde District, Foshan City, Guangdong Province, 528300 China.
Contact Person
Sivvy Leung