Prefabricated Steel Structure Factory Bolted Portal Frame Structure Customized Size
Price:
USD20-70Square Meter/Negotiable
MOQ:
100 square meters
Delivery Time:
20-40days
Brand:
HCGG
Product Description
Precision Prefabricated Steel Structure Factory Buildings
Modern industrial facilities constructed with high-strength steel as the primary load-bearing material. These bolted portal frame structures are factory-prefabricated and assembled on-site, offering superior performance compared to traditional reinforced concrete construction.
The core structural system utilizes a "steel skeleton" approach where columns, beams, and trusses are manufactured from steel profiles (H-beams, C-beams, Z-beams) and steel plates. This prefabricated modular construction method enables precise manufacturing in controlled factory environments followed by rapid on-site assembly using bolted connections and welding.

Technical Specifications & Parameters
| Component | Specification |
|---|---|
| Main Steel Frame - Column | Q345, Q355 Welded H Section Steel |
| Main Steel Frame - Beam | Q345, Q355 Welded H Section Steel |
| Secondary Frame - Purlin | Q235 C and Z Purlin |
| Knee Brace | Q235 Angle Steel |
| Tie Rod | Q235 Circular Steel Pipe |
| Brace | Q235 Round Bar |
| Vertical & Horizontal Support | Q235 Angle Steel, Round Bar or Steel Pipe |
| Cladding System - Roof Panel | EPS Sandwich Panel / Glass Fiber Sandwich Panel / Rock Cotton Sandwich Panel / PU Sandwich Panel / Steel Sheet |
| Cladding System - Wall Panel | Same as Roof Panel Options |
| Accessories - Window | Aluminum Alloy Window / PVC Window |
| Accessories - Door | Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door |
| Accessories - Rainspout | PVC |
| Live Load on Roof | 50kg/m² (Color Steel Panel Surrounded) |
| Wind Resistance Grade | According to Local Climate Conditions |
| Earthquake Resistance | 8 Grades |
| Structure Usage Life | Up to 50 Years |
| Finishing Options | Vast Array of Colors and Types Available |
| Paint Options | Alkyd Painting, Two Primary Painting, Two Finish Painting (Gray Paint, Red Paint, White Paint, Epoxy Zinc etc.) or Galvanized |
Key Advantages & Structural Benefits
- Rapid Construction: Significantly shorter project timelines and faster commissioning cycles
- Flexible Space Design: Adaptable to various industrial requirements and operational needs
- Structural Safety: Stable, reliable performance across diverse applications and environments
- Cost Efficiency: Lower overall project costs with superior cost-effectiveness
- Environmental Sustainability: Energy-efficient construction aligned with green development principles
Project Process & Customization
Design & Quotation Workflow
- Inquiry Receipt & Project Intent Confirmation
- Collaborative Design Development & Detailed Quotation Provision
- Formal Project Approval & Contract Finalization
- Factory Production & Precision Fabrication Process
- Careful Packaging & Global Shipping Coordination
- On-site Installation Guidance & Comprehensive Technical Support

Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Luoyang Huicheng Steel Structure Co., Ltd.
Location
No. 1 Shuangxiang Road, Luoxin Industrial Park,Luoyang City, Henan Province
Contact Person
Alisa Yang