Wuhan Mingyang Technology Co., Ltd
                                                                                                           
Verified Supplier
Years
Since
Menu

Transformer Comprehensive Tester Instrument Transformer Testing Ct Pt Analyzer

Price Negotiable
Price: 3000usd
MOQ: 1
Delivery Time: 1 week
Brand: MINGYANG
Product Description
Transformer Comprehensive Testing Instrument

Advanced CT/PT analyzer for comprehensive transformer testing with precision measurement capabilities.

Technical Specifications
AC Current Source
Single phase current output (RMS) 0 - 30A/phase, accuracy: 0.2% ± 5mA
Six phase parallel output (RMS) 0-180A/six parallel outputs with the same phase
Allowable working value of phase current for long time 9.9A
Maximum output power Per phase 320VA
Maximum output power of six phase parallel current 1800VA
Maximum output allowable working time of six-phase parallel current 5s
General Parameters
Frequency range 0 - 1000Hz, accuracy: 0.001Hz
Harmonic number 2-20th
Phase 0-360°, accuracy: 0.1°
DC Current Source
DC current output 0-±10A/phase, accuracy: 0.5% ± 5mA
AC Voltage Source
Single phase voltage output (RMS) 0 - 120V/phase, accuracy: 0.5% ± 5mV
Line voltage output (RMS) 0-240V
Phase voltage/line voltage output power 75VA/100VA
Frequency range 0 - 1000Hz, accuracy: 0.001Hz
DC Voltage Source
Single phase voltage output amplitude 0-±160V, accuracy: 0.5% ± 5mV
Output amplitude of line voltage 0-±320V
Phase voltage/line voltage output power 90VA/180VA
Switching Value Terminal
Switch input terminal 8 pairs
Idle contact 1-20mA, 24V, internal active output of the device
Potential reversal Passive contact: low resistance short circuit signal
Active contact: 0-250V DC
Switch output terminal 4 pairs, empty contacts
Interruption capacity: DC: 0-30V/5A, AC: 0-250V/5A
Additional Specifications
Time frame 1ms - 9999s, measuring accuracy: 1ms
Volume and weight of single machine Volume: 418*363*208mm³, approximately 17.8kg
Power Supply AC220V±10%, 50/60Hz, 10A
AC Current Working Time Specifications
<10A working current Working hours ≤ 60 minutes
20A > Working current ≥ 10A Working hours ≤ 70 seconds
30A > Working current ≥ 20A Working hours ≤ 15 seconds
Working current: 30A Working hours ≤ 5 seconds
Product Images
 
 
Wireless Monitoring Module Setup for Transformer Calibrator
Battery Discharge Testing in Operation with Calibrator

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Wuhan Mingyang Technology Co., Ltd
Location Hao Mai Mansion, No. 11, Wudayuan First Road, East Lake High-Tech Development Zone, Wuhan, Hubei Province, P.R.China
Contact Person Emma Zhang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.