Guangdong Lvhuan Environmental Protection Technology Co., Ltd.
                                                                                                           
Verified Supplier
12 Years
Since 2014
Menu

Breathable Permeable Running Track 13mm Athletics Track For Tight Deadlines

Price Negotiable
Price: between 18 and 52 USD
MOQ: 20KG& 500 sqm
Delivery Time: Normal delivery time: Shipment within 15 days after order confirmation
Brand: lida&lvhuan
Product Description
Rapid Installation Track For Renovations Best For Tight Deadlines, Stadium Retrofits, Multi‑Sport Conversions

Key Advantages: Covers asphalt or concrete directly | Full install in 5–7 days | No specialist curing required | Playable in 48 hours after finishing | Ideal for school holidays

Product Overview

The rapid‑install version of the breathable porous track is designed for fast‑track projects where time on site is limited. Its single‑component binder cures quickly under ambient conditions, and the open‑cell surface does not require perfect base flatness – minor irregularities are absorbed. A 400m track can be overlaid on existing asphalt in 6 days by a 6‑person crew, compared to 12–15 days for traditional systems.

Perfect for school summer breaks, stadium refurbishments before a tournament, or converting tennis courts to multi‑use tracks.

Technical Specifications – Installation Focus
Parameter Value
Minimum base cure time Existing asphalt – ready immediately; new concrete – 14 days
Installation rate 600–800 m²/day (team of 6)
Time to walk after finish 24 hours
Time for full running 48 hours
Thickness 10–13mm (can be as low as 8mm for non‑competition)
Impact Absorption 35–42% (slightly firmer for quick install)
Weather restriction during install No rain; temperature 5–35°C

All other World Athletics training track parameters are met.

Why So Fast?
  • Single‑component PU – no field mixing errors, ready to pour.

  • No primer needed on clean asphalt – saves one day.

  • Spray coating applied wet‑on‑wet – no drying between layers.

  • No heavy rollers – simple manual screeding.

Ideal Scenarios
  • School tracks required before term starts

  • University facilities between semesters

  • Indoor sports halls converting to multi‑use

  • Temporary event flooring (can be removed later)

Process Comparison
Step Traditional PU Track Rapid Porous Track
Base preparation 2 days (grinding + priming) 0.5 day (pressure wash)
Base layer curing 24h 6h
Top layer + curing 2 days 1 day
Line marking 1 day 0.5 day
Total 12–15 days 5–7 days
Project Example – 48‑Hour Turnaround

Bangkok, Thailand – International school needed a new 200m track before a Friday sports day. Installation started Monday morning; Wednesday afternoon the track was playable. Total 3,200 m².

MOQ & Services

No minimum. Sample panels shipped within 3 days. We provide video call guidance during your first installation day.

FAQ – Rapid Install

Q: Is the durability the same?
→ Yes, 8+ years. The faster process does not compromise chemical cure.

Q: Can we install it ourselves?
→ Yes – we supply full video SOP, written guide, and remote support. Optional paid technician visit.

Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangdong Lvhuan Environmental Protection Technology Co., Ltd.
Location No. 54, Cuizhuyuan, Tangwei, West District, Dayawan, Huizhou City, Guangdong Province, China
Contact Person Jay zhu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.