Guangdong Lvhuan Environmental Protection Technology Co., Ltd.
                                                                                                           
Verified Supplier
12 Years
Since 2014
Menu

Durable School Track 13mm Athletic Synthetic Track Rapid Installation

Price Negotiable
Price: between 18 and 52 USD
MOQ: 20KG& 500 sqm
Delivery Time: Normal delivery time: Shipment within 15 days after order confirmation
Brand: lida&lvhuan
Product Description
Rapid Installation Composite Running Track Best for Tight schedules, school holiday projects, last‑minute renovations

Key Advantages: Full install in 5–7 days | Works on existing asphalt or concrete | No specialised curing room needed | Playable in 48 hours after finish | Ideal for summer break projects

Product Overview

The Rapid Installation Composite Running Track is a fast‑curing version of the standard composite system. It uses a single‑component PU binder that sets quickly even at moderate temperatures (15–30°C). The three layers are applied wet‑on‑wet, eliminating drying time between coats. A 400m track can be completed by a 6‑person team in 6 days, compared to 12–15 days for traditional systems. This makes it perfect for projects with strict deadlines – such as school renovations that must finish before students return.

Suitable for schools, university fields, residential jogging paths, and sports club upgrades where downtime must be minimised.

Technical Specifications – Installation Focus
Parameter Value
Minimum base cure Old asphalt: immediate; new concrete: 14 days
Installation rate 700–900 m²/day (6 workers)
Time to walk 24 hours after last coat
Time to run 48 hours
Total thickness 13mm (8+3+2) – can be reduced to 10mm
Impact absorption 36–43% (slightly firmer for fast cure)
All other parameters Meet World Athletics training standards
System Structure – Same as standard composite but with fast‑cure binder.
Installation Comparison
Step Traditional Composite Rapid Composite
Base prep 1–2 days 0.5 day (wash only)
Base layer cure 24h 6h
Reinforcement cure 12h 4h
Top layer cure 24h 12h
Total 12–15 days 5–7 days
Recommended Granules – Same options as standard (recycled or virgin)
Applications – Time‑sensitive projects
  • School tracks during summer or winter break

  • University fields between semesters

  • Residential developments opening on schedule

  • Sports club upgrades before tournament

Case Studies (Rapid Install)
Country Project Area Install time Year
Thailand International school 3,300 m² 6 days 2024
UAE Residential community track 2,200 m² 5 days 2025
Chile University training field 2,800 m² 7 days 2024
Shipping & MOQ

No MOQ. Fast‑cure binder must be used within 3 months of delivery. Lead time 15 days.

FAQ – Rapid Install

Q: Is the durability the same as standard composite?
→ Yes, 10+ years. Fast cure does not reduce chemical strength.

Q: Can we install it ourselves?
→ Yes. We provide video SOP and remote support. Paid technician available.

Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangdong Lvhuan Environmental Protection Technology Co., Ltd.
Location No. 54, Cuizhuyuan, Tangwei, West District, Dayawan, Huizhou City, Guangdong Province, China
Contact Person Jay zhu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.