Guangdong Lvhuan Environmental Protection Technology Co., Ltd.
                                                                                                           
Verified Supplier
12 Years
Since 2014
Menu

Multi Use PU Sports Flooring 3mm - 5mm Outdoor Sport Court Flooring

Price Negotiable
Price: between 7.4and 37USD ,Subject to actual raw material costs and exchange rates
MOQ: 20KG& 500 sqm
Delivery Time: Normal delivery time: Shipment within 15 days after order confirmation
Brand: lida&lvhuan
Product Description
Rapid‑Install & Refurbishment Si‑PU Court (Fast‑Cure, Low Downtime)Best for Renovations, school holiday projects, urgent repairs, multi‑use conversions

Key Advantages:

  • One‑component PU underlayers cure faster than two‑component systems – dry in 4‑8 hours
  • Waterborne PU top coat dries in 2‑4 hours – low VOC, no odor
  • Complete 3‑4 mm system in 4‑5 days (including base prep)
  • Can be applied over existing asphalt, concrete, or old acrylic/urethane courts
  • Ideal for refurbishment projects with tight deadlines

Product Overview

The Rapid‑Install Si‑PU Court system is optimised for speed and convenience. All underlayers (primer, interface agent, elastic PU, reinforcement PU) are one‑component moisture‑curing formulations with accelerated cure rates – each coat dries in 4‑8 hours at 25°C (compared to 8‑12 hours for standard Si‑PU). The waterborne top coat dries in 2‑4 hours. A complete 3‑4 mm thickness system can be installed in 4‑5 days by a 3‑person crew, including surface preparation. The system bonds excellently to old asphalt, concrete, and even existing acrylic or polyurethane courts after proper cleaning and priming. This makes it perfect for school holiday renovations, tournament venue upgrades, and urgent repairs.

✅ Ideal for: school summer/winter break projects, club court refurbishment, conversion of hard courts to cushioned courts, urgent repair of damaged sports surfaces, and temporary event courts.

Technical Specifications – Rapid Install
Parameter Value
Total thickness 3–4 mm (2‑3 mm elastic + 1 mm reinforcement + top)
Drying time per coat (25°C) Primer/interface: 4h; Elastic/reinforcement: 4‑8h; Top coat: 2‑4h
Full cure to play 48‑72 hours
Total installation time (400 m²) 4‑5 days (3 workers)
Shock absorption 25‑35%
Service life 8‑10 years
Installation Comparison (400 m² court)
Step Standard Si‑PU Rapid‑Install Si‑PU
Base prep 1 day 0.5‑1 day
Primer + interface (2 coats) 1.5 days (drying 12h each) 1 day (drying 4h each)
Elastic layer (2‑3 coats) 2‑3 days (12h dry) 1.5 days (8h dry)
Reinforcement (1 coat) 0.5 day + 12h 0.5 day + 4h
Top coat (2 coats) 1 day + 24h 0.5 day + 12h
Total 7‑10 days 4‑5 days
Surface Preparation for Overlays
  • Existing asphalt/concrete: Clean, fill cracks, apply primer
  • Old acrylic court: Clean, abrade lightly, apply interface agent
  • Old PU / rubberised court: Clean, test adhesion, apply specific primer
Applications – Time‑sensitive
  • School multi‑purpose courts (must finish before term starts)
  • Club court refurbishment between tournament dates
  • Conversion of hard acrylic courts to cushioned Si‑PU
  • Urgent repair of damaged community courts
  • Temporary event sports floors
Case Studies – Rapid‑Install Si‑PU
Country Project Area Thickness Install time Year
UAE International school (holiday project) 500 m² 4 mm 5 days 2024
Chile Club basketball court refurbishment 400 m² 3.5 mm 4 days 2025
Poland Public park court (urgent repair) 350 m² 3 mm 4 days 2024
Packaging & Shipping

Same as standard. Rapid‑cure PU has 6‑month shelf life. Lead time 15 days. No MOQ.

FAQ – Rapid‑Install

Q: Does fast cure affect performance?
→ No. Final mechanical properties (shock absorption, rebound, tensile strength) are identical to standard Si‑PU. Only drying speed is increased.

Q: Can I apply this over old cracked asphalt?
→ Minor cracks (<3 mm) can be filled. Major cracks require base repair before applying Si‑PU.

Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangdong Lvhuan Environmental Protection Technology Co., Ltd.
Location No. 54, Cuizhuyuan, Tangwei, West District, Dayawan, Huizhou City, Guangdong Province, China
Contact Person Jay zhu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.