Henan Staurk Machinery CO.,LTD
                                                                                                           
Verified Supplier
18 Years
Since 2008
Menu

30TPD-100TPD GOLD CIL Plant CIP Gold Processing Plant Customized

Price Negotiable
Price: Negotiation
MOQ: 1
Delivery Time: 30-45 days
Brand: Staurk
Product Description

30-100tpd GOLD CIP CIL Plant

 

1.Product Introduction CIP CIL Gold Extraction

For a 30-100 tpd (tonnes per day) scale, a Gold CIP/CIL plant is considered a "modular" or "compact" operation. This capacity is ideal for small-scale miners or pilot projects because it balances manageable capital investment with high industrial recovery efficiency.

 

2.Application CIP CIL Gold Extraction

  • Scale: Small-to-medium mining operations (30, 50, or 100 tonnes of raw ore per day).

  • Ore Types: Primarily oxidized gold ores, river sand gold concentrates, and gravity separation tailings.

  • Versatility: Highly effective for recovering "fine-grained" gold that cannot be captured by simple gravity sluices or centrifugal concentrators.

 

3.Working Principle CIP CIL Gold Extraction

The plant typically follows a 5-stage mechanical and chemical flow:

  1. Crushing & Grinding: Ore is crushed to <10mm and then wet-ground in a Ball Mill to a fine pulp (usually 85% passing 200 mesh).

  2. Thickening: The pulp is dewatered in a High-Efficiency Thickener to reach a density of 35%–40% solids, which is optimal for leaching.

  3. Leaching & Adsorption (CIL/CIP):

    • CIL: Gold is dissolved by the eco-friendly reagent and simultaneously adsorbed by activated carbon in the same tanks.

    • CIP: Gold is dissolved in the first 2 tanks and adsorbed in the subsequent 4–6 tanks.

  4. Desorption & Electrowinning: The "loaded carbon" is treated with high-temperature/pressure stripping to release the gold into a solution, which is then electroplated onto steel wool cathodes.

  5. Smelting: The gold-bearing cathode sludge is melted in a clipping furnace to produce >90% purity gold bullion.

 

4.Advantages CIP CIL Gold Extraction

  • High Recovery: Even at 30 tpd, you can achieve 92%–98% recovery, far exceeding the 50%–70% typical of gravity-only plants.

  • Modular Design: Many 30-100 tpd plants are now built as skid-mounted or containerized units, allowing for rapid setup (2–4 weeks) and easy relocation.

  • Eco-Friendly Integration: Perfectly suited for the cyanide-free reagents discussed earlier, making environmental permitting much easier for small operators.

  • Low Operational Footprint: Requires minimal land clearing and can often be powered by mid-sized diesel generators or local grid connections.

 

5.Our Solutions

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Henan Staurk Machinery CO.,LTD
Location No. 220 Zhongyuan Middle Road, Zhongyuan District, Zhengzhou City, Henan Province,China
Contact Person Jason

Request A Quote

Please check your email address.
Your message must be at least 20 characters.