Henan Staurk Machinery CO.,LTD
                                                                                                           
Verified Supplier
18 Years
Since 2008
Menu

Gold Cil Plant 50TPD CIP CIL Gold Processing Plant 98% Recovery Rate

Price Negotiable
Price: Negotiation
MOQ: 1
Delivery Time: 30-45 days
Brand: Staurk
Product Description

50 tpd GOLD CIP CIL Plant

 

1.Product Introduction CIP CIL Gold Extraction

 

The 50 TPD Gold CIP/CIL Plant is a compact, high-efficiency mineral processing system specifically engineered for small-to-medium scale mining operations. Designed with a modular or skid-mounted structure, this plant integrates grinding, leaching, and adsorption into a streamlined footprint, allowing for rapid deployment and high recovery rates of fine-grained gold.

 

2.Application CIP CIL Gold Extraction

  • Small-Scale Mining: Ideal for independent miners or cooperatives processing 50 tonnes of raw ore per day.

  • Target Materials: Specifically designed for oxidized gold ore, gravity separation tailings, and high-grade gold concentrates.

  • Remote Locations: Perfect for sites with limited infrastructure due to its low power requirements and compact design.

  • Pilot Testing: Used by large mining groups to test the metallurgical recovery of a new ore body before full-scale investment.

 

3.Working Principle CIP CIL Gold Extraction

 

The 50 TPD plant operates through a series of integrated mechanical and chemical stages:

  1. Comminution: Raw ore is crushed and fed into a Ball Mill, grinding the rock into a fine pulp (typically 85% passing 200 mesh).

  2. Classification: A spiral classifier or hydrocyclone returns coarse particles to the mill while sending fine pulp to the thickener.

  3. Leaching & Adsorption:

    • CIL Mode: Eco-friendly leaching reagents dissolve the gold while activated carbon simultaneously adsorbs it within the same agitated tanks.

    • CIP Mode: Gold is first dissolved in leaching tanks, then adsorbed by carbon in separate downstream stages.

  4. Carbon Recovery: "Loaded" carbon is screened out and sent to a Desorption  Electrowinning unit to produce high-purity gold sludge.

 

4.Advantages CIP CIL Gold Extraction

  • High Recovery Rate: Achieves 92% to 98% gold recovery, significantly outperforming traditional gravity or heap leaching methods.

  • Plug-and-Play Design: The modular "skid" design allows for fast installation (7–10 days) and easy relocation if the ore body is exhausted.

  • Environmental Compliance: Optimized for Cyanide-Free Reagents, making it easier to obtain environmental permits and manage tailings.

  • Low Operational Cost: Features automated reagent dosing and high-efficiency motors to minimize electricity and chemical consumption.

  • Small Footprint: Requires minimal civil engineering (level ground and a basic concrete pad), saving on initial CAPEX.

 

5.Our Solutions

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Henan Staurk Machinery CO.,LTD
Location No. 220 Zhongyuan Middle Road, Zhongyuan District, Zhengzhou City, Henan Province,China
Contact Person Jason

Request A Quote

Please check your email address.
Your message must be at least 20 characters.