Nanjing Lanjiang Water Treatment Equipment Co., Ltd
                                                                                                           
Verified Supplier
25 Years
Since 2001
Menu

Effortless Manual Insertion Stop Log Gate Lightweight High Strength For Water Control

Price Negotiable
Price: Negotiable
MOQ: 1
Delivery Time: Negotiable
Brand: Lanjiang
Product Description
Stop Log Gate - DLZ Series
Specialized flow interception device engineered for water treatment and power generation industries, providing flexible manual control to block or release water flow in channels.
Product Overview
The Stop Log Gate (DLZ series) is installed directly into water channels, allowing operators to manually insert or lift stop logs piece by piece. This system offers convenient operation, reliable sealing performance, high mechanical strength, long service life, and minimal maintenance requirements. Widely applied for channel flow interception and isolation in tap water plants, sewage treatment facilities, and power plants.
Technical Specifications
Foundation Dimensions
Spec L (mm) Stop Log Height (n × Blocks) H1 (mm) H (mm) B (mm) B1 (mm) Foundation L1 (mm)
400 n × 600 600 N + 100 120 350 640
500 n × 600 600 N + 100 120 350 740
600 n × 600 600 N + 100 120 350 840
800 n × 500 500 N + 150 140 400 1100
1000 n × 500 500 N + 150 140 400 1300
1200 n × 400 400 N + 150 160 400 1500
1400 n × 400 400 N + 150 160 400 1700
1600 n × 400 400 N + 150 160 400 1900
1800 n × 400 400 N + 150 160 400 2100
2000 n × 400 400 N + 150 160 400 2400
Note: 'N' is determined according to user requirements. The gate can be custom-manufactured. For other specifications, please refer to the closest spec in the table to determine reserved hole dimensions.
Performance & Material Parameters
Working Head: < 5m
Applicable Media: Sewage, freshwater, seawater, etc.
Applicable Temperature: < 50℃
Leakage Rate: < 2.1L/mm*m*blocks
Gate Slot Material: Stainless steel, carbon steel
Stop Log Material: Stainless steel, aluminum alloy
Seal Material: Water-stop rubber
Key Features & Benefits
  • Effortless Manual Operation: Insert or lift stop logs piece by piece manually without complex hoisting machinery, ensuring convenient daily operations and maintenance.
  • Lightweight & High Strength: Premium stainless steel or aluminum alloy construction provides easy manual handling while guaranteeing excellent mechanical strength and long service life.
  • Reliable Sealing Performance: High-quality water-stop rubber seals minimize leakage rate to less than 2.1L/mm*m*blocks, ensuring dependable interception performance.
  • Broad Media Adaptability: Engineered for working heads under 5 meters, performing flawlessly in freshwater, corrosive sewage, and high-salinity seawater up to 50°C.
Frequently Asked Questions
  • Q: Where are Stop Log Gates primarily installed and what are they used for?
    A: They are installed in diversion or drainage channels of tap water plants, sewage treatment plants, and power generation facilities, functioning as flow interception devices for temporary or long-term water stream blocking and isolation.
  • Q: Is it physically demanding to operate this gate? Does it require a heavy-duty motor?
    A: No heavy-duty motors are required. The stop logs are made of lightweight stainless steel or aluminum alloy, allowing operators to easily insert or remove them piece by piece manually with minimal effort.
  • Q: Will it rust or degrade if exposed to seawater at a coastal power plant or harsh sewage?
    A: The equipment features anti-corrosion materials including stainless steel gate slots, stainless steel or aluminum alloy logs, and durable water-stop rubber seals, ensuring long lifespan in sewage, freshwater, and seawater environments.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Nanjing Lanjiang Water Treatment Equipment Co., Ltd
Location No.18, Xinyu Road, Hengliang Street, Luhe District, Nanjing, Jiangsu Province, China.
Contact Person Ryan

Request A Quote

Please check your email address.
Your message must be at least 20 characters.