Medium-Duty Semi-Welded Trailing Arm for C-Section Steel with Q235/Q355 High Strength Steel and 500-2000 Bearing Capacity
Price:
$ 0.9-2.4
MOQ:
1000 pieces
Delivery Time:
Delivery within 15-30 days
Product Description
Semi-Welded Trailing Arm for C-Section Steel | Medium-Duty Bracket Accessory for Solar, Cable Tray & Seismic Support Systems
Product Description:
This semi-welded trailing arm is a core matching accessory for C-section steel support systems, manufactured from high-strength carbon steel. Featuring a semi-welded joint structure, it balances reliable connection strength and flexible on-site assembly, and is widely applied to solar mounting brackets, cable tray supports, seismic bracing systems, factory steel structures and pipeline support projects.
Fully compatible with standard C-section steel profiles, the precisely executed semi-welded joints ensure high tensile strength, vibration resistance and deformation resistance. The compact structure effectively distributes applied loads and improves wind and snow load resistance. It allows easy position and angle adjustment during installation. Available with hot-dip galvanized or powder coated anti-corrosion finishes, it delivers long service life and excellent cost efficiency, making it suitable for industrial construction, municipal engineering and new energy power station projects.
Parameter Table:
| Parameter Name | Specification | Unit |
|---|---|---|
| Material | Q235 / Q355 High-Strength Carbon Steel | — |
| Compatible C-Section Steel | C100–C200 (Standard Sizes) | mm |
| Processing Technology | Semi-Welding + Stamped Forming | — |
| Anti-Corrosion Treatment | Hot-Dip Galvanizing / Powder Coating | — |
| Bearing Capacity | 200–500 | N |
| Applicable Temperature | -40 ~ 80 | ℃ |
| Service Life | ≥15 | Year |
Installation and Usage Notes:
- Pre-installation inspection: Check the semi-welded trailing arm thoroughly before installation. Confirm there is no damage, cracks or rust on the weld joints and main body, and verify that the specification matches the C-section steel to be assembled.
- Installation operation: Use professional tools to connect the trailing arm to the C-channel. Ensure all joints are tightly fastened without looseness. Do not overload or force-fit components to avoid structural damage.
- Positioning adjustment: Align the installation position with the stress points of the entire support system. Adjust the mounting angle according to actual site conditions to achieve uniform load distribution and avoid local stress concentration.
- Post-installation inspection: Conduct a comprehensive inspection after installation. Test load-bearing performance and structural stability, and put into service only after all safety requirements are met.
- Daily maintenance: Regularly inspect weld seams and connecting parts during service. Maintain or replace components in a timely manner if rust, looseness or deformation is found.
- Safety warning: Strictly prohibit operation beyond the rated bearing capacity and applicable temperature range to prevent safety accidents.
- Transportation and storage: Avoid collision and extrusion during transportation and storage. Store in a dry and ventilated environment to prevent premature corrosion.
FAQ:
Q: Are you a manufacturing factory or a trading company?
Q: What is your production lead time?
Q: Can you provide customized design services?
Q: What are your payment terms?
Q: How do you control product quality?
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Langfang Yaoguang New Energy Technology Co., Ltd
Location
Langfang City, Hebei Province, China
Contact Person
Li
