Safety Electromagnetic Flow Meter 20mA PTFE PFA F46 Liner Material DN200-DN400 EMF Flow Meter
Price:
USD200-800/ set
MOQ:
1 set
Delivery Time:
2-3 word days
Brand:
INSTE
Product Description
Safety Electromagnetic Flow Meter 20mA PTFE PFA F46 Liner Material DN200-DN400 EMF Flow Meter
Product Overview
Safety Electromagnetic Flow Meter 20mA with PTFE/PFA/F46 Liner Material for DN200-DN400 pipe sizes. Designed for reliable flow measurement in industrial applications.
Common Problems and Solutions
-
Flow Reading Fluctuates/Jumps (Most Common)Causes: Air bubbles in the pipe, insufficient pipe filling, poor grounding, electromagnetic interference
- Air removal: Install at the low point of the pipeline or add an exhaust valve upstream
- Full pipe: Install horizontally with electrodes on the side to avoid air accumulation at the top; install vertically with fluid flowing upward
- Grounding: Use a dedicated ground wire with resistance <10Ω; install grounding rings for plastic/insulated pipes
- Anti-interference: Route signal cables away from power cables and ground the shielding layer at one end only
-
No Flow Reading/Zero DisplayCauses: Empty pipe, reversed wiring, excitation/electrode failure, incorrect parameters
- Ensure the pipeline is fully filled with no negative pressure
- Check for reversed excitation and signal wires
- Verify parameters such as meter diameter, measuring range, and units
- Measure excitation coil resistance (normal: 80-150Ω)
-
Inaccurate Measurement (Over/Under Reading)Causes: Electrode fouling, damaged liner, insufficient straight pipe length, zero drift
- Clean electrodes: Use a soft brush or dilute hydrochloric acid to remove insulating deposits
- Inspect liner: Check for wear, bulges, or cracks
- Straight pipe requirements: Upstream ≥10D, downstream ≥5D (D = pipe diameter)
- Zero calibration: Perform zero calibration when the pipe is full and static
-
Zero Drift/Negative Reading with FlowCauses: Poor grounding, contaminated electrodes, low medium conductivity, interference
- Re-establish reliable grounding to ensure equipotential connection
- Clean electrodes and check insulation
- Confirm medium conductivity >5μS/cm
- Keep away from strong interference sources such as inverters and motors
Routine Maintenance (Preventive Measures)
- Clean electrodes regularly to prevent fouling coverage
- Maintain full pipe condition with no air bubbles or negative pressure
- Ensure reliable grounding, separate from motor/pipe grounding
- Route signal and power cables separately
- Perform zero calibration regularly (every 3-6 months)
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Nanjing Inste Automation Co., Ltd.
Location
East Mozhou Road , Nanjing ,Jiangsu , China
Contact Person
Qi