Shenzhen Coolstart Refrigeration Equipment Co., Ltd
                                                                                                           
Verified Supplier
25 Years
Since 2001
Menu

Refcomp SRC-S(W)-463 SRC-S-463-L4 R407C Screw Refrigertion Compressor

Price Negotiable
Price: Discussed
MOQ: 1
Delivery Time: 1 Month
Brand: Refcomp
Product Description
Refcomp SRC-S(W)-463 SRC-S-463-L4 R407C Screw Refrigeration Compressor
Product Description
  • Precision Rotor Profile: Advanced asymmetrical rotor geometry delivers exceptional volumetric efficiency and smooth compression for this screw refrigeration compressor.
  • High-Efficiency Oil Separation: Built-in multi-stage oil separator reaches up to 99.85% efficiency, minimizing oil carryover and maintaining system heat exchange capacity.
  • Robust Bearing Structure: Heavy-duty angular contact and thrust bearings support high mechanical loads, ensuring long-term continuous reliability.
  • Flexible Load Adaptation: Supports step capacity regulation at 100%, 75%, 50%, and 25%, as well as stepless control down to 25% to match varying system cooling loads.
Product Image
Refcomp SRC-S Screw Compressor unit showing industrial design and connections
Technical Parameters
Model SRC-S(W)-463 SRC-S-463-L4
Standard Motor Power 160HP/120KW
Displacement (50/60Hz) 510/612 m³/h
Weight 775KG
Oil Charge 16L
Cooling Capacity Regulation 100%, 75%, 50%, 25% (stepless 100%-25%)
Electrical Heater 275W-230V-50/60Hz
Standard Motor 400/3/50Hz-460/3/60Hz
LRA Y/Δ 374/1155A 453/1333A
Technical diagram of Refcomp SRC-S screw compressor components
Frequently Asked Questions
Q: What details are required when selecting this screw refrigeration compressor for a new refrigeration plant?
A: Selection requires confirming the required cooling capacity, evaporating and condensing temperatures, target refrigerant, and project electrical power specifications.
Q: What piping considerations are essential during installation?
A: Ensure precise connection to the 80.0 mm discharge and 105.5 mm suction ports, provide rigid pipe anchoring to reduce vibration, and verify discharge check valve positioning to prevent liquid return on shutdown.
Q: What pre-commissioning checks must be performed prior to starting the compressor?
A: Check that the 16 dm³ oil charge is visible in the sight glass, verify proper signal wiring to the INT69 SNY protection module, and ensure the crankcase heater has energized for sufficient pre-heating time.
Q: What routine maintenance practices ensure stable continuous operation?
A: Inspect the internal suction filter for pressure drop, monitor oil differential pressure across internal flow channels, and check motor thermal protection circuits during periodic maintenance.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shenzhen Coolstart Refrigeration Equipment Co., Ltd
Location Room 1801, Building 1, Kangli city, No. 66 Pingji Road, Longgang District, Shenzhen, Guangdong,China
Contact Person Lynn

Request A Quote

Please check your email address.
Your message must be at least 20 characters.