Concrete Forming Accessories
Q235 Steel Scaffold Guard Rail 1.5m Height Adjustable Up to 400mm Slab
Adjustable scaffold guard rail for slab formwork safety. Fits slab thickness up to 400mm via crank. Supports wood plank or tube fencing. Available in painted, powder coated, or galvanized finish. Durable Q235 steel construction.
Tubular Safety Scaffold Guard Rail Q235 Steel 1.5m Height Fall Prevention
Tubular guard rail for fall protection on floors and slab formwork. Adjustable to 400mm slab thickness. Fits wood plank or scaffold tube. Painted, powder coated, or galvanized finish. Durable Q235 steel construction.
Universal Scaffold Guard Rail 1.5m Height Galvanized Surface Fall Protection
Universal guardrail post for floor and slab formwork fall protection. Adjustable up to 400mm slab thickness. Supports wood plank or scaffold tube fencing. Available in painted, powder coated, or galvanized finish. Durable and reliable.
Adjustable Aligning Panel Clamp for Concrete Formwork 480mm 5.3kg OEM
Aligning panel clamp for framed formwork, compatible with Doka Framax. Connects and aligns steel panels horizontally and vertically, closing joints tightly. Supports filler widths up to 200mm. Durable, efficient, OEM available.
Frami Clamp for Doka Framed Formwork Panels 151mm Pin Length 1.2kg
Self-aligning, crane-handling clamp for safe panel connections. Dirt-resistant, hard-wearing, and easy to fix with a formwork hammer. Single standard clamp simplifies assembly. Ideal for B2B concrete forming projects.
Steel Press Scaffolding Pipe Clamp BFD Alignment Coupler 290mm Panel Connector
The BFD alignment coupler ensures flush, tight panel joints for perfect concrete finishes. With one hammer strike, it creates a flexurally stiff connection, preventing leaks. Ideal for fast assembly of formwork panels. Durable steel construction, 290mm length, 4.24kg weight.
Cast Iron Spring Clamp for Concrete Forming Tensioning Wire Tie Bar 5-10mm
Durable cast iron spring clamp for securing wire tie bars in light formwork. Allows 5-10mm bar diameter. Fast tensioning with tool. Reliable for concrete forming systems.
Push Bar Tensioner for Concrete Forming Accessories Tension Release Tie Bars 5-10mm
Bar tensioner tool for tensioning spring clamps on tie bars 5-10mm diameter. Available in 3.5kg and 2.8kg models. Durable steel plate construction ensures reliable performance in light formwork applications. Ideal for fastening tie rods efficiently.
Galvanized Casted Beam Flange Clamp 43x105mm Locking Formwork Cam Clamp
Durable galvanized cam clamp for locking and securing formwork in concrete casting. Easy to install and release with a hammer blow. Suitable for 4-10mm tie rods. Reusable, reliable, and ideal for efficient formwork systems.
High Strength Rapid Clamp Tensioner for 4-10mm Galvanized Reinforcing Bars
Rapid wedge clamp for concrete formwork, compatible with 4-10mm bars. Saves 40% time with simple hammer-lock action. Durable galvanized finish, lightweight at 0.44 kg. Ideal for efficient form-tie systems.
Concrete Formwork Push Bar Tensioner for Spring Clamps 5-10mm Tie Rod Tightener
Durable bar tensioner for rapid spring clamps, suitable for 5-10mm tie rods. Lightweight design (2.8-3.5kg) ensures easy operation. Ideal for light formwork applications. Custom packaging available. Trusted by HORIZON FORMWORK with 10 years of export experience.
Spring Rapid Concrete Formwork Clamp for 5-10mm Wire Tie Bar 4-11KN
Spring rapid clamp for fast wire tie bar tensioning in light formwork. Supports 5-10mm bars with 4-11KN load capacity. Durable steel plate, compact design. Ideal for foundation and beam formwork. Custom packing and OEM available.
Multi Purpose Concrete Forming Cross Head U Head Jack for H20 Beam Support 230mm
Stable support for single or double H20 beams in slab form assembly. Allows one beam longitudinally and two laterally for flexible on-site use. Durable 2.5kg steel construction. Ideal for efficient concrete forming systems.
Adjustable Floor Prop Fork Head Q235 Steel Plate for H20 Beam Slab Formwork 140x80x200mm
Durable Q235 steel floor prop head stabilizes H20 beams in slab formwork. Precision-engineered 140x80x200mm size ensures compatibility. Supports heavy loads, enhances safety. Custom options available. Trusted by global contractors for reliable concrete forming solutions.
Galvanized Four Way Forkhead for H20 Beams 230mm Length 2.5kg Concrete Forming Accessories
Galvanized fork head secures H20 timber beams on props with lock pin. 2-way design holds 1-2 beams. Durable, reliable for slab shuttering. Custom options available from experienced formwork supplier.
Q235 Steel Foldable Tripod for Slab Formwork 700mm 900mm Height Holding Steel Props
Heavy-duty folding tripod for quick and stable erection of steel props in slab formwork. Made from Q235 square tube, available in 700mm and 900mm working heights. Improves stability of high free-standing floor tables. Durable, easy to use, and ideal for construction projects.