Electrical Equipment & Supplies Batteries Battery Management System(BMS)

RS485 BMS-16S200A-20A Alkaline Battery Pack Battery Management System

Price Negotiable
Price: usd50$
MOQ: 100 pcs
Delivery Time: 7-25 days after order confirm
Brand: TAC
Product Description

TCA BMS-16S200A-20A Alkaline Battery Pack Battery Management System
1. Functional Features
 
High-integrated analog front-end                                                            Adjustable overcurrent protection
Isolation of the power supply circuit                                                        Has a variety of dormancy and awakening modes
Integrated serial port IC                                                                           Low power consumption
High Voltage Accuracy (≤10mV)                                                             RS485 Communication
High Current Accuracy (≤2%@FS)                                                         Adjustable Parameter Settings
4-Way Battery Temperature Detection (≤2°C)                                         Data Refresh Interval (Period) ≤ 2 Seconds
SOC Estimation Function                                                                        LED Status Indication Function
SOH Estimation Function                                                                        Charge Equalization Function
Short Circuit Protection Function                                                             SOC Accuracy (≤5% @ 50% Capacity Range Or More)
 
 
2. Functional Block Diagram

 
 
3. Environmental Requirements
 

ProjectsParametersUnit
Operating Temperature-20 to 75
Storage Temperature-40 to 75
Operating Humidity≤95 (45°C±2°C)%RH
Storage Humidity≤90 (45°C±2°C)%RH
Temperature Measurement-40 to 125
Atmospheric Pressure70~106kPa

 
 
4.Install connection instructions:
There are strict sequence requirements on the protection board. First weld B-, P-, B +, P +, and plug in the battery sampling line connector in order from low to high. After power on, charge or button activation. Load or charger can be added after all cables are installed.
When removing, first unplug the charger or load, remove the battery sampling line connector in the order from high to low, and finally remove B +, P +, B-and P-.

 
 
5. Precautions for use:
1) When connecting the battery lead, note not to misconnect or reverse connect. If the wrong lead is connected, it may cause damage to this circuit board, which should be re-tested again before use.
2) When assembly, the protective plate is careful not to directly contact the surface of the cell to avoid damage to the cell. Ensure the assembly.
3) In the process of use, pay attention to the lead head, soldering iron, solder and other components do not touch the components on the circuit board, otherwise it may lead to damage to the protection board.
4) The use process should pay attention to anti-static, moisture-proof, waterproof and other measures.
5) Please follow the designed parameters and the conditions of use during the use process, and do not exceed the relevant values in this specification, otherwise it may lead to damage to the protection plate.
6) After combining the battery pack and the protection panel, if there is no voltage output or no charge for the first time, please re-check whether the wiring is correct.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guang Zhou Sunland New Energy Technology Co., Ltd.
Location No.27 BOWANG Street ,Nan Cun Town, Panyu, Guangzhou, GD,China
Contact Person Alice

Request A Quote

Please check your email address.
Your message must be at least 20 characters.