CHINA HARZONE INDUSTRY CORP.,LTD.
                                                                                                           
Verified Supplier
59 Years
Since 1967
Menu

Uncomplicated Mechanized Fast Bridge With 21m Length

Price Negotiable
Price: Negotiable
MOQ: negotiation
Delivery Time: negotiation
Brand: Harzone
Product Description

Fast Bridge / Emergency Bridge / Mechanized Bridge With 21m Length                                           
                                                                

Fast Bridge / Emergency Bridge / Mechanized Bridge With 21m Length is sort of emergency equipment carried by vehicle and completes erection and retrieval by erection car. It is mostly used to erect a bridge with a length of 21m and a width of 3.3m to ensure all varieties of vehicles with a tracked load of up to 60 tons or an axle load of up to 17 tons to traverse small medium rivers and dry gaps hastily.             
          
               

Specifications for Heavy Mountain Bridge

Tracked load / axle load

55t / 17t

Outline dimension (L*W*H)

13*3.3*3.6m

Gross weight

32.5t

Bridge weight

10.5t         

Bridge length

21m

Negotiating length (on hard banks)

19m

Section length

10.63m

Bridge width (when expanding)

3.3m

Track width

1.15m

Section height

0.95m

End section height

0.35m

Operator

2-3

Erection time

10 min

Max. longitudinal slope / lateral slope

±10%  / ±5%

Allowable bank height difference

5%

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHINA HARZONE INDUSTRY CORP.,LTD.
Location No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
Contact Person Sun Ruyu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.