CHINA HARZONE INDUSTRY CORP.,LTD.
                                                                                                           
Verified Supplier
59 Years
Since 1967
Menu

Erection Time 75min Axle Load Mechanized Bridge Simple Structure

Price Negotiable
Price: Negotiable
MOQ: negotiation
Delivery Time: negotiation
Brand: Harzone
Product Description

Erection Time 75min Axle Load Lt-20 Simple Structure Mechanized Bridge
              
Description:                                                               

Erection Time 75min Axle Load Lt-20 Simple Structure Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.
                           

Erection Length 17m, 25.5m, 34m, 42.5m, 51m Axle Load Lt-20 Simple Structure Mechanized Bridge possesses the feature of good flexibility, big single span, simple structure, speedy erection, high mechanization and less manpower. Besides, it has the advantages of convenient transportation and favorable adaptability of bank.

 

Specification

Curb weight of erection vehicle (including 3 men)                        32.5t

Curb weight of transport vehicle                                                   20.8t

Bridge bay weight:                                                                        9.2t

Design load: tracked load                                                             LD-60          

             Wheeled (load on axle)                                                    LT-20

Erection length                                                         17m, 25.5m, 34 m, 42.5 m, 51 m

Erection width                                                                                4m

Erection time (complete bridge)                                                    75min                                            

Retrieval time (complete bridge)                                                   75min

Operator                                                        6~7 men (not including drivers of transport vehicles)

China Harzone is one of the most professional “steel truss bridge” manufacturers all over the world and we always make our effort to provide our best service and products to our clients. So far, over 40 countries in Asia, Africa and Latin America have purchased our products, including Myanmar, Thailand, Peru, Ecuador, Sudan, Pakistan, Laos and so on.


China Harzone has enjoyed a proud history, it must also create a bridge future.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHINA HARZONE INDUSTRY CORP.,LTD.
Location No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
Contact Person Sun Ruyu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.