portable Temporary Steel Bridge Army Bailey Bridge modular design
CB200 Designed Span 6-54m Temporary Steel Bridge Bailey Truss Bridge
CB200 Designed Span 6-54m Temporary Steel Bridge Bailey Truss Bridge Description:
CB200 Designed Span 6-54m Temporary Steel Bridge Bailey Truss Bridge is portable steel bridge ,It has been widely used in various fields, its most important feature is to achieve a variety of spans, bear carrying capacity, light and handy components, easy to dismantle and strong adaptability can be quickly completed with simple tools and manpower.
Standard Roadway 3.15m / 4.2m Bailey Truss Bridge Army Temporary Bridge surface protection can be paint or hot-dip galvanized.
CB200 Designed Span 6-54m Temporary Steel Bridge Bailey Truss Bridge adopts modular design, featuring a large span,short construction period,fast erection, multiple reuses of bridge components. It has excellent interchangeability and connection ferformance. The bridge structure can be designed according to the bridge span and load requirement,which can quickly construct a temporay or semi-permanent bridge.
CB200 Designed Span 6-54m Temporary Steel Bridge Bailey Truss Bridge Specifications:
| Type | CB200 |
| Designed Span | 6-54m |
| Designed Load | HL93,HA,HB,tracked load 50t |
| Panel Dimension | 2.134*3.048m |
| Carriageway Width | 4.2m/7.35m |
| Deck type | steel deck/ wood deck |
CB200 Designed Span 6-54m Temporary Steel Bridge Bailey Truss Bridge Advantage:
Possessing the features of simple structure,
great stability and long fatigue life
being capable of an alternative span, loading capacity
easy disassembling,
heavy loading capacity,
Before offering the quotation, we need to know the exact usage condition so that we can propose a proper technical specification. Hereon, pls kindly supply the following information as detailed as possible:
- Type of Bridge
- Span, Centre to Centre of Bearing of Supports (Bridge Length)
- Height of the Bridge, Vehicular, Pedestrian clearance
- Type of Deck
- Carriageway Width
- Sidewalk
- Design Vehicular Loading
- Seismic Loading
- Minimum Vertical Clearance for Navigational Traffic
- Maximum Deflection
- Ratio of Depth to Length of Span
- Galvanization and Finishing
- Environmental Condition
- Life service requirement ( for how many years the bridge is intended for use)
- Quotation terms (EXW or other)
- Better if there are site pictures can be provided.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.


