CHINA HARZONE INDUSTRY CORP.,LTD.
                                                                                                           
Verified Supplier
59 Years
Since 1967
Menu

Width 3.8m Fast Erection Mechanized Bridge Modular Iron Bridge

Price Negotiable
Price: Negotiable
MOQ: negotiation
Delivery Time: negotiation
Brand: Harzone
Product Description

Width 3.8m Fast Erection Modular Mechanized Bridge Iron Bridge

Width 3.8m Fast Erection Modular Mechanized Bridge Iron Bridge​​ Description:  

                                                                                                                                         
Width 3.8m Fast Erection Modular Mechanized Bridge Iron Bridge is an emergency bridge equipment with bridge trestle, which can accomplish continuous multi-span erection.It's a set of equipment mainly used for bridging small and medium rivers, dry gaps and marshland with a length within 75m and a depth within 5.5m to ensure all sorts of tanks, artilleries and vehicles, and personnel to get across.        

The complete set consists of five transport vehicles with bridge spans with a length of 15m. The chassis is type XC2300/8×8 15T class cross-country truck, with advanced engine, gearbox and axles etc.

The trestles are controlled by hydraulic winch; the outriggers ban be adjusted by automatic control technology, with double class hydraulic cylinders. Width 3.8m Fast Erection Modular Mechanized Bridge Iron Bridge is erected with shear style erection, and span stretching at mean time to keep safety and stability in erection.

 

Width 3.8m Fast Erection Modular Mechanized Bridge Iron Bridge​​​ Data:

 

Width 3.8m Fast Erection Modular Mechanized Bridge Iron Bridge is used to ensure all kinds of military vehicles with tracked load up to 60t and wheeled load up to 13t to overcome medium and small rivers, dry ditches and marsh lands.

 

No Item Data
1 Loading capacity  
  Tracked load 60t
Wheeled load 13t
2 Single span length 15m
3 Total length of one whole set 75m
4 Carriage way width 3.8m
5 Adjusting height of trestle  
  Max. 5.5m
Min. 3.32m
6 Erection time  
  Single span 9~11min
Whole set 55~65min
7 Allowed max water velocity 2m/sec
8 Operators  
  single span 7
whole set 13
9 Total weight 30.6t
10 Outline dimension(L×W×H) ≤11800mm*3200mm*3700mm

 

Main features of Width 3.8m Fast Erection Modular Mechanized Bridge Iron Bridge​​:

 

Good flexibility: using 8×8 cross country chassis

Continuous erection: bridge length unlimited

Fast erection: 9-11min (single span)

High mechanization level &low labor intensity: remote control

High loading capacity: tracked load 60t, wheeled load 30t

Less operators: 7(single span), 13(one set)

 

Sticking to the mission of “taking emergency safeguard as its own task and contributing to human safety”, the Company, relying on various types of emergency equipment developed and manufactured by itself, have played an important role in many disaster relief activities, such as Wenchuan Earthquake, Zhouqu Debris Flow, the Devastating Flood in Bangladesh and the Great Earthquake in Pakistan. As an eligible supplier for emergency purchasing to UN emergency relief agencies, the Company not only sells its products at home, but also exports to over 40 countries and regions.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHINA HARZONE INDUSTRY CORP.,LTD.
Location No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
Contact Person Sun Ruyu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.