Anodized PV MID Clamp Solar Panel Mounting System For Roof Mounting Systems
Anodized PV MID Clamp For Roof Mounting Systems , Customized Dimensions
Product: Aluminum solar mounting frame of end clamp
2. Flexible post spacing withstands different wind&snow loads.
3. High quality material in Aluminum and SUS 304.
4. Highly corrosion resistant surface treatment.
5. Screws and nuts go with every componts needed.
6. Fasteners and rail nut fully configured to save extra parts purchasing.
7. Mechanical calculation and reliability tested to ensure highset product quality.
8. 12-25 years system and structural guarantee.
Specification:
| Material | Aluminum alloy: 6063 T5/ Stainless Steel 304 |
| Shape | According to drawing and sample (square, angle, flat, T-profile, rotundity, oval, slot) |
| Deep machining | Precise cutting, drilling, tapping, CNC milling, CNC lathe and so on |
| Surface treatment | Sandblasting/anodized |
| Specifications | According to your design drawings and your samples |
| Certification | ISO9001-2008 |
| Packaging Detail | Export Standard Carton With Pallet,interleaving each profile to protect the surface |
| Delivery Detail | 7--25 days after receive customer's deposits |
Packing
| Bundles Packing | Inside: packed with plastic protective film to protect each piece Outside: wrap to be bundles by waterproof craft paper or EPE film |
| Carton packing | Inside: each pcs pack in one plastic bag; Outside: Numbers of quantity put in one carton. |
| Wood Pallet packing | Inside: Bundles or cartons packing Outside: Numbers of bundles or cartons laden on one wood pallet |
| Customized requirement | Customized packing requirement available |
Other service details
| MOQ | 200kgs for each item ;Usually 13 - 15tons for a 20Gp ;25 - 28tons for a 40HQ |
| OEM service | Drawing , sample or design service offer by customer |
| Production Capacity | 80 000tons annually |
| Deep process | CNC ,drilling ,milling ,cutting ,bending ,tapping ,welding ,assembling ,punching |
| Brand Name | Hentec |
| Certificatesand Standard | ISO9001 - 2000 |
| Delivery time |
Die developing and sample testing :12 - 18days ; |
| Payment Terms | T/T 30% for deposit ,balance before delivery |
| FOB port | Shanghai |
| Settlement Terms | charge by final actual weight or by drawing theoretical weight |
Description:
1) Material: Anodized AL6063-T5
2) The solar roof mounting mid clamp is easy to install.
3) Warranty: 10 years
4) Standard compliance: AS/NZS 1170 and other international standards.
Specifications:
|
Part No . |
Description |
Package |
|
HT-MC-35 |
Mid clamp 35mm |
100sets/pack |
|
HT-MC-40 |
Mid clamp 40mm |
100sets/pack |
|
HT-MC-45/46 |
Mid clamp 45/46mm |
100sets/pack |
|
HT-MC-50 |
Mid clamp 50 mm |
100sets/pack |

Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

