3-In-1 Automatic Juice Bottle Filling Machine 7.68kW Juice Bottling Equipment
3-in-1automatic juice bottle filling machine for filling production line
Packaging Details: Wooden Box
Delivery Detail: 30 Working Days
3-in-1 automatic juice bottle filling machine for filling production line
- Full filling to avoid the bottle from sinking after the bottle cooling off, and to decrease the dissolved oxygen to the utmost extent.
- Reasonable structured storage hopper and material supply system make the material in constant flow speed, constant pressure without frothing. Usually high position tank is adopted.
- The storage hopper has the characteristic of gas discharge, full sealing and temperature detecting. In moderate and high speed production line, the material distributor replaces the big liquid tank to realize the complete CIP.
- Sanitary filling head system is of umbrella structure, high filling speed.
- Perfect filling temperature control system.
- Reflux tank system has the function of supplying the material automatically.
- Perfect CIP system.
- To realize stable running, convenient for maintenance and long life, all the electric and pneumatic components are from world famous manufacturer. Example, PLC from OMRON, transducer from MITSUBISHI, pneumatic components from FESTO, switch from TURCK, motors from SEW or ABB, touch screen from DIGITAL, etc
2) Technique parameter
| RCGF24-24-8 | RCGF32-32-10 | |
| Productivity | 10000BPH | 14000BPH |
| Rinsing Head | 24 | 32 |
| Filling Head | 24 | 32 |
| Capping Head | 8 | 10 |
| Bottle Volume | 350ml~2000ml±10ml | |
| Bottle Diameter | φ50-92mm | |
| Bottle Height | 150-310 mm | |
| Filling Tolerance | ±2% | |
| Cap Size | 28mm and 30mm PE Standard Caps | |
| Air Pressure | 0.6MPa | |
| Air Consumption | 500 L/min | |
| Gas Consumption | 0.4 m3/min | 0.5 m3/min |
| Motor Power | 7.68kW | 9.18kw |
| Voltage | 380V | |
| Dimension | (L×W×H) 2750*2180*2200mm | (L×W×H) 3600*2800*3150mm |
| Weight | 5300kg | 5000kg |
| Filling Principle | Gravity Filling | |
Why
Choice
us?
We otffer professional turnkey project from design till done of the whole project.
1.Project consultation
2.Design
3.Factory building
4.Installation
5.Commissioning
6.Training
We can provide beverage filling line as below:
1. Complete pure/mineral water production line
2. Complete pure/mineral water treatment machine
3. Complete juice production line
4. Complete carbonated beverage production line
5. 5 Gallons drinking water production line.
6.End-of-line packaging system
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.