TORICH INTERNATIONAL LIMITED
                                                                                                           
Verified Supplier
29 Years
Since 1997
Menu

Condenser Seamless Steel Tube Uns C17200 Alloy Beryllium Copper / Copper

Price Negotiable
Price: negotiable
MOQ: 0.5 Ton
Delivery Time: 30-35 days
Brand: TORICH
Product Description

Beryllium Copper / Copper UNS C17200 Alloy Condenser Seamless Steel Tube 10 - 80mm OD ASTM B111

 

product description

Copper and Copper-Alloy Seamless Condensers tubes and Ferrule Stock

Good quality for heat exchanger

General size as OD 19.05, 25 ,12.7 ,WT 1.65 ,1.245 ,2.11.

 

images (1)_.jpg 2.jpg

 

Chemical requirements
Copper or copper alloy UNS No. Copper Tin Al Ni incl Co

Pb

max

Fe

max

Zn

max

Mn

max

As Sb

P

max

C44300 70.0-73.0 0.9-1.2     0.07 0.06 remainder   0.02-0.06    
C44400 70.0-73.0 0.9-1.2     0.07 0.06 remainder     0.02-0.10  
C44500 70.0-73.0 0.9-1.2     0.07 0.06 remainder       0.02-0.10
C60800 remainder   5.0-6.0   0.01 0.1     0.02-0.35    
C61300 remainder 0.2-0.5 6.0-7.5 0.15max 0.01 2.0-3.0 0.1 0.2     0.015
C70400 remainder     4.8-6.2 0.05 1.3-1.7 1.0 0.3-0.8      
C70600 remainder     9.0-11.0 0.05 1.0-1.8 1.0 1.0      
C71000 remainder     19.0-23.0 0.05 0.50-1.0 1.0 1.0      

 

company introduction

 

-1

 

production workshop

 

ss welded stainless steel pipes

 

our certificate

 

ss welded stainless steel pipes

 

 

FAQ

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us

 

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

 

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TORICH INTERNATIONAL LIMITED
Location Suite 1604-3, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Contact Person Richard SHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.