TORICH INTERNATIONAL LIMITED
                                                                                                           
Verified Supplier
29 Years
Since 1997
Menu

Astm A523 Plain End Seamless Welded Pipe / Erw Steel Pipe For High Pressure

Price Negotiable
Price: USD600-1000/Ton
MOQ: 5Tons
Delivery Time: 30-45 work days
Brand: TORICH
Product Description
Products Description
 
TORICH ASTM A523 Plain End Seamless and ERW Steel Pipe for High-Pressure
Product Name
Plain End Seamless and ERW Steel Pipe for High-Pressure
Standard
ASTM A523, A370, A751, E59, ANSI B36.10
Techinique
Electric Resisitance Welded
Type
Seamless and Welded
Test
Flattening Test, Hydrostatic Test
Coatings
The pipe shall not be given a mill coating of paint, oil, or any other material either inside or outside
Application
High Pressure pipe-type electric cables

 

Chemical Requirements

 
Carbon, max
Manganese, max
Phosphorus, max
Sulfur, max
 
Heat
Product
Heat
Product
Heat
Product
Heat
Product
Grade A
Seamless
ERW
 
0.22
0.21
 
0.25
0.25
 
0.90
0.90
 
0.95
0.95
 
0.035
0.035
 
0.045
0.045
 
0.050
0.050
 
0.060
0.060
Grade B
Seamless
ERW
 
0.27
0.26
 
0.30
0.30
 
1.15
1.15
 
1.20
1.20
 
0.035
0.035
 
0.045
0.045
 
0.050
0.050
 
0.060
0.060

 

Tensile Requirements

 
Tensile Strenth, min, ksi (MPa)
Yield Strenth, min, ksi (MPa)
Geade A
48 (330)
30 (205)
Grade B
60 (415)
35 (240)

 

 

Wall Thickness
Elongation in 2 in. or 50 mm, min, %
mm
Grade A
Grade B
5/16 (0.312)
7.94
35.0
30.0
9/32 (0.281)
7.14
33.2
28.0
1/4 (0.250)
6.35
31.5
27.0
7/32 (0.219)
5.56
29.8
25.5
3/16 (0.188)
4.76
28.0
24.0
5/32 (0.156)
3.97
26.2
22.5
1/8 (0.125)
3.18
24.5
21.0
3/32 (0.094)
2.38
22.8
19.5
1/16 (0.062)
1.59
21.0
18.0
 
Product Show

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

 
FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

TORICH ASTM A523 Plain End Seamless and ERW Steel Pipe for High-Pressure

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TORICH INTERNATIONAL LIMITED
Location Suite 1604-3, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Contact Person Richard SHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.