TORICH INTERNATIONAL LIMITED
                                                                                                           
Verified Supplier
29 Years
Since 1997
Menu

TORICH ASTM A269 Stainless Steel Tube Machining Products For Condenser

Price Negotiable
Price: negotiable
MOQ: 5Tons
Delivery Time: 30-45 work days
Brand: TORICH
Product Description
 
Products Description
 
TORICH ASTM A269 Stainless Steel Tube Machining Products For Condenser
Standard
ASTM A269
Matrial
Ferrite TP409/409L TP430,443
Size
OD: 6-20mm WT: 0.4-1.5 mm Length: According to Customer's Requirement
Manufacture
Tubes are made by seamless process.
At the manufacturer's option,, tubing may be furnished either hot finished or cold finished.
Surface Condition
The finished tubes are free of scale., slight amount of oxidation is not considered as scale
Test and Inspection
Tension Test, Flaring Test, Flange Test, Reverse Test, Hardness Test, Hydrostatic or Nondestructive Electric Test
Application
1.Cooler for beer & Drinks
2.Refrigerator for Medical Equipment
3.Condenser for Industrial Equipment
4.Stainless Steel Condenser
5.Stainless Steel Hardware Products

 

Production Show

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

TORICH ASTM A269 Stainless Steel Tube Machining Products For Condenser

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TORICH INTERNATIONAL LIMITED
Location Suite 1604-3, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Contact Person Richard SHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.