TORICH INTERNATIONAL LIMITED
                                                                                                           
Verified Supplier
29 Years
Since 1997
Menu

30CrMoE Hydraulic Cylinder Tube GB/T 28884 For 300L - 3000L Volume Gas Cylinder

Price Negotiable
Price: USD800-2000/ton
MOQ: 5Tons
Delivery Time: 30-45 work days
Brand: TORICH
Product Description
Products Description
 
TORICH GB/T 28884 30CrMoE 300L - 3000L Seamless Steel Tubes for Large Volume Gas Cylinder
Key Word
Seamless Gas Cylinder Tube
Material
30CrMoE, 42CrMoE, 4130X, 4142
Size
OD: 80-1200mm WT: 4-100mm Length: 2000-9000mm
Surface
With Anti Rust Protection
Production Method
Cold Drawn
Application
Gas Cylinder with 300L-3000L Volume
Delivery Conditions
Steel pipe in hot rolling(enlarge) state,cold drawn or cold drawn after heat treatment state delivery.

 

Tolerance
According to the following tables, or according to customers' request.

Category
Size
Tolerance
Outside Diameter (D)
-
±1%D
Minimum Wall Thickness (Smin)
D≤559
+25% Smin
0
D≤559
+27.5% Smin
0
Wall Thickness (S)
D≤559
+12.5% S
-10% S
D≤559
±12.5% S

 

Mechanical Property

Steel Grade
Tensile Strength
Lower Yeild Strength or specified plasticity elongation
Percentage Elongation after fracture
Yeild ratio

Hardness

HBW
-40℃ Shock absorption energy
KV2/J
 
Ra/MPa
ReL or Rp0.2a/MPa
A50mma/%
(ReL/Ra or Rp0.2/Ra)/%
 
Average
Single Sample
30CrMoEb
≥720
≥485
≥20
≤86
≤269
≥40
≥32
42CrMoEc
≥930
≥760
≥16
-
≤330
≥40
≥32
Grade 30CrMoE mechanical property is equivanlent to 4130X
Grade 42CrMoE mechanical property is equivanlent to 4142

 

Product Show

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

TORICH GB/T 28884 30CrMoE 300L - 3000L Seamless Steel Tubes for Large Volume Gas Cylinder

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TORICH INTERNATIONAL LIMITED
Location Suite 1604-3, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Contact Person Richard SHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.