TORICH INTERNATIONAL LIMITED
                                                                                                           
Verified Supplier
29 Years
Since 1997
Menu

T1 T1a T1b Seamless Alloy Steel Pipe ASTM A209 For Boiler And Superheater

Price Negotiable
Price: negotiable
MOQ: 10 Tons
Delivery Time: 3-6 Weeks
Brand: Torich
Product Description

ASTM A209 T1 T1a T1b Seamless Alloy Steel Tubes For Boiler and Superheater

 

Size range: O.D.: 6-420mm W.T.:1-50mm L: according to customer requirement

 

Steel Grade and Chemical Compositions:

 

Element T1 T1a T1b
Carbon 0.10-0.20 0.15-0.25 0.14max
Manganese 0.30-0.80 0.30-0.80 0.30-0.80
Phosphorus 0.025 0.025 0.025
Sulfur max 0.025 0.025 0.025
Silicon 0.10-0.50 0.10-0.50 0.10-0.50
Molybdenum 0.44-0.65 0.44-0.65 0.44-0.65

 

Mechanical Properties:

 

Element T1 T1a T1b
Tensile strength min Mpa 380 365 415
Yield strength min Mpa 205 195 220
Elongation min % 30 30 30

 

Manufacture:

Tubes are made by seamless process.

At the manufacturer`s option, tubing may be furnished either hot finished or cold finished.

 

Test and Inspection:

- Mechanical Test

- Tension Test

- Flaring Test

- Flattening Test

- Hardness Test

- Hydrostatic or Nondestructive Electric Test

 

 

 

 

QUALITY CONTROL:

 

1.Incoming Raw Material Inspection

2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

 

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

FAQ

 

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TORICH INTERNATIONAL LIMITED
Location Suite 1604-3, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Contact Person Richard SHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.