TORICH INTERNATIONAL LIMITED
                                                                                                           
Verified Supplier
29 Years
Since 1997
Menu

Carbon Steel Precision Tube EN10305-2 E355 E235 Cold Drawn Welded Pipe

Price Negotiable
Price: Negotiated
MOQ: 3 tons
Delivery Time: 25-30 days
Brand: TORICH
Product Description
Carbon Steel Precision Tube EN10305-2 E355 E235 Cold Drawn Welded Pipe
 
TORICH located in China, has a rich experience in EN10305-2 cold drawn welded precision steel tubes with more than 20 years experience.

 

1. Standard:   
EN10305-2 Cold Drawn Precision Welded Steel Pipe


2. Steel Grade and Chemical Compositions:                                             

Steel Grade C Si Mn P S
Steel Name Steel Number max max max max max
E155 1.0033  0.11 0.35 0.70  0.025 0.025
E195 1.0034  0.15 0.35 0.70  0.025 0.025
E235 1.0308  0.17 0.35 1.20  0.025 0.025
E275 1.0225  0.21 0.35 1.40  0.025 0.025
E355 1.0580  0.22 0.35 1.60  0.025 0.025


3. Production method of EN10305-2 precision metal piping: 
The tubes shall be manufactured from electric welded hollows by cold drawn. The tubes shall be not contain strip end welds.

4.Size range: 
O.D.:5-420mm     W.T.:0.5-50mm      L:max12000mm

5.Packing of EN10305-2 high precision steel pipe: 
In Hexagonal Bundles, with anti-rust oil protection, with seaworthy packing 

6.Delivery condition of carbon steel precision tube:

1). +C (Cold drawn/hard) No heat treatment after the final cold drawig process
2). +LC (Cold drawn/ soft) After the final heat treatment there is a suitable drawing pass
3). +SR (Cold drawn and stress relieved) After the final cold drawing process there is a stress relieve heat treatment in a controlled atmosphere
4). +A (Soft annealed ) After the final cold drawing process the tubes are annealed in a controlled atmosphere
5). +N (Normalized) After the final cold drawing operation the tubes are normalized in a controlled atmosphere

 

7.Display of cold drawn precision steel tube:

Carbon Steel Precision TubeCarbon Steel Precision Tube

8.Packing method:

Carbon Steel Precision TubeCarbon Steel Precision Tube

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

 

9.Q&A

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your delivery term?

A: FOB, CIF, CFR,EXW,CPT,FCA

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TORICH INTERNATIONAL LIMITED
Location Suite 1604-3, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Contact Person Richard SHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.