Brake System PVF Coating Single Wall Bundy Tube
SAE J526 PVF Coating Single Wall Bundy Tube For Brake System
1. Standard
SAE J526 Welded low-carbon tubing
EN10305-6 Welded cold drawn tubes from hydraulic and pneumatic power systems
ASTM A254 Copper-brazed steel tubing
2. Steel Grade
BHG1, SPCC, SPCD, SPCEN, ST14, ST15, ST16, DC04, DC05, DC06
3. Heat Treatment
BK or NBK
4. Specification
| O D/ mm | 4 | 4.2 | 4.76 | 6 | 6.35 | 7.8 | 8 | 9.52 |
| W T | 0.5-1.0mm (0.5-0.7mm common WT) | |||||||
| Tolerance | ±0.05mm | |||||||
| Length | 180Kg/coil; 700-1000m/coil; per customer’s request | |||||||
5. Surface Treatment
| Coating | Thickness | Salt spray test duration |
| Copper/White Zinc/Colour-Zinc | 8μm | 72h |
| PVF | 8μm+20μm | 1000-2000h |
| Military Green Zinc | 8μm | 180h |
| GALFAN | 8μm+20μm | 1000-2000h |
| Nylon | 8μm+40μm | 180h |
6. Application
1) Fluid carrying system for automobiles
2) Fluid carrying system for refrigerators
3) Wire condenser for chillers, showcase
4) Vending machine, ice machine etc.
Detailed Images
A&Q
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample but need pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

