TORICH INTERNATIONAL LIMITED
                                                                                                           
Verified Supplier
29 Years
Since 1997
Menu

100Cr6 Gr15 Seamless Alloy Steel Pipe TORICH

Price Negotiable
Price: negotiable
MOQ: 5 tons
Delivery Time: 20-45 days
Brand: TORICH
Product Description

100Cr6 Gr15 Seamless Alloy Steel Pipe TORICH

 

TORICH is a professional steel tubes supplier from China with over 23 years manufacturing and exporting experience.
Our main products are seamless precision pipe,carbon steel seamless precision pipe,alloy steel seamless precision pipe, stainless steel seamless precision pipe.The material we usually use for producing 100Cr6 Gr15 Seamless Alloy Steel Pipe is GCr15 100Cr6 100CrMnSi6-4 100CrMnSi6-6 100CrMo7
 

Steel Grade/Steel Material:

Steel Grade mass fraction %
C Si Mn P S Cr Mo
GCr15 0.95-1.05 0.15-0.35 0.20-0.40 ≤0.027 ≤0.020 1.30-1.65 ≤0.10
100Cr6 0.93-1.05 0.15-0.35 0.25-0.45 ≤0.025 ≤0.015 1.35-1.60 ≤0.10
100CrMnSi6-4 0.93-1.05 0.45-0.75 1.00-1.20 ≤0.025 ≤0.015 1.40-1.65 ≤0.10
100CrMnSi6-6 0.93-1.05 0.45-0.75 1.40-1.70 ≤0.025 ≤0.015 1.40-1.65 ≤0.10
100CrMo7 0.93-1.05 0.15-0.45 0.25-0.45 ≤0.025 ≤0.015 1.65-1.95 0.15-0.30

 

Delivery Condition: +C, +LC, +SR, +A, +N

 

Size Range:

OD: 10-260mm
WT: 2-30mm
Length: 2-12m

Our regular size: 29.4x5.6mm, 36.9x7.73mm, 62.9x7.3mm etc

 

Bearing Steel Tube Characteristic:
High strength
High-precision
Good Surface Quality
Stable quality
Smooth Roughness
TORICH QUALITY ASSURANCE

 

Production Processs:

Seamless Cold Drawn or Seamless Cold Rolled + Heat Treatment

 

100Cr6 Gr15 Seamless Alloy Steel Pipe from Production

 

Q1: Are you trading company or Manufactuer ? A: Of course, we are manufactuer. We are in field of honed tube and piston rod for more than 16 years.

Q2: What is the payment term? Do you accept LC ? A: Normally payment is by T/T, 30% advance payment, balance pay after receiving the copy BL. L/C is accepted. Also we provide Trade Assurance online which will protect the interests of both sides.The payment will be hold by authorized Third Party until you receive the goods under the Trade Assurance Policy.

Q3: What is your delivery time? A: normally, it is 25~60 days after you confirm the order. If your order is urgent, we would like to try our best to meet your requirements.

Q4: What is the package? A: The package is seaworthy wooden case by container, or accoding to your requirements.

Q5: Can I add my logo on the goods? A: Yes, OEM and ODM are available for us.

Q6: Do you have inspection procedures before sending goods? A: 100% inspection before packing and Third Party Inspection Service is available if customer apply for it.

Q7: Can I visit your factory before the order? A: Please, we are finding long-term partners, welcome to visit our factory. We will pick you up at the airport.

ISO683-17 GCr15 100Cr6 Cold Drawn Seamless Steel Tube Bearing Tube

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TORICH INTERNATIONAL LIMITED
Location Suite 1604-3, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Contact Person Richard SHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.