TORICH INTERNATIONAL LIMITED
                                                                                                           
Verified Supplier
29 Years
Since 1997
Menu

EN10305-1 Precision Cold Drawn Steel Tube Seamless E355 E235 Steel Pipe

Price Negotiable
Price: Negotiated
MOQ: 1 ton
Delivery Time: 25-35 Days
Brand: TORICH
Product Description

EN10305-1 Precision Cold Drawn Steel Tube Seamless E355 E235 Steel Pipe

 

TORICH is a professional supplier and exporter of precision seamless cold drawn steel tube with 20 years.

 

1.Brief introduction of Precision Cold Drawn Steel Tube:

Standard: EN10305-1

Size: 4mm-260mm

W.T.: 0.5mm-25mm

Shape: Round

Production type: Cold drawn or cold rolled

Length: Single random length/ Double random length or as customer’s actual request max length is 1.8m to fit container length.

Grade: E215, E235, E355

2.Delivery Conditions:

The tubes shall be manufactured from hot finished seamless tubes by cold drawing or other suitable processes.

The tubes shall be supplied in one of the delivery conditions as follows:

Designation Symbol Description
Cold drawn/hard +C No heat treatment after the final cold drawing process.
Cold drawn/soft +LC After the final heat treatment there is a suitable drawing pass.
Cold drawn and stress relieved +SR After the final cold drawing process there is a stress relief heat treatment in a controlled atmosphere.
Annealed +A After the final cold drawing process the tubes are annealed in a controlled atmosphere.
Normalized +N After the final cold drawing operation, the tubes are normalized in a controlled atmosphere.

3.Delivery Condition Symbol in accordance with EN10305 and DIN2391:

Symbol in accordance with EN 10305 Symbol in accordance with DIN2391
+C BK
+LC BKW
+SR BKS
+A GBK
+N NBK

4.Mechanical Properties:

Mechanical properties at room temperature
Steel Grade Minimum values for the delivery condition
Steel Name Steel Number +C +LC +SR +A +N
Rm

 

Mpa

A

 

%

Rm

 

Mpa

A

 

%

Rm

 

Mpa

ReH

 

Mpa

A

 

%

Rm

 

Mpa

A

 

%

Rm

 

Mpa

ReH

 

Mpa

A

 

%

E215 1.0212 430 8 380 12 380 280 16 280 30 290 to 430 25 30
E235 1.0308 480 6 420 10 420 350 16 315 25 340 to 480 235 25
E355 1.0580 640 4 580 7 580 450 10 450 22 490 to 630 355 22

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

5.Precision Cold Drawn Steel Tube Show:

Precision Cold Drawn Steel TubePrecision Cold Drawn Steel Tube

6.Packing method:

Precision Cold Drawn Steel TubePrecision Cold Drawn Steel Tube

7.A&Q

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TORICH INTERNATIONAL LIMITED
Location Suite 1604-3, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Contact Person Richard SHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.