TORICH INTERNATIONAL LIMITED
                                                                                                           
Verified Supplier
29 Years
Since 1997
Menu

NPT Threaded Stainless Steel Reducing Tee 4'' NB ASME B16.11 Standard

Price Negotiable
Price: Negotiable
MOQ: Negotiable
Delivery Time: 35-45days
Brand: TORICH
Product Description

ASME B16.11 Stainless Steel Reducing Tee

 

The ASME B16.11 Reducing Tee is used in piping systems to change the direction of the flow. The difference between equal and unequal tee is the size of its diameter. The branch diameter of a Forged Screwed Unequal Tee is smaller than its main diameter. To illustrate, a reducing tees is usually described as NPS diameters, where the dimensions given are 4” x 4” x 3”. In this instance, the ANSI B16.9 Reducing Sw Tee Dimensions wherein 4 inches is the mainline pipe diameter, whereas 3 inches is the reducing branch. Both standards ASME B16.11 and ANSI B16.9 cover several aspects that could be used in the manufacture of fittings like Carbon Steel Threaded Reducing Tee. These aspects include overall dimensions, ratings, tolerances, marking as well as material requirements. However, the these two standards can be distinguished by the type of fitting produced. For instance, ASME B16.11 is a standard that provides recommendations for Forged Steel, Socket-Welding like the ASME B16.11 Socket Weld Reducing Tee and Threaded Fittings.

 

Specification  ASME B16.11 Reducing Tee
Size 1/8” NB to 4” NB (Screwed-Socket)
Forged Type  NPT (Threaded), BSPT, BSPP.
Dimensions Class 2000#, 3000#, 6000#, 9000#
Standard JISB2311, IS 2062, DIN, ANSI B16.28, ASME B16.9, BS10, ASME B16.47, ASME B16.38, MSS-SP-43, JISB2313, ASME B16.25, MSS SP-75, DIN2605, JISB2312, PN, AWWA C207, BS4504, BS1560, BS, GB, ISO
Connection Type  Welding
Pressure Rating Socket, Threaded: 3000 LBS, 6000 LBS, 9000 LBS

Product Pictures:

 

Company Introduction:

Packaging and Delivery:

FAQ:

Q: Are you trading company or manufacturer?

A: We are a professional steel pipes materials manufacturer.

 

Q: How long is your delivery time?

A: Generally it takes 7-14 days if the goods are in stock or 30-60 days if there is no stock, this mainly depends on quantity.

 

Q: Do you provide free sampleas?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

 

Q: What is your terms of payment?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TORICH INTERNATIONAL LIMITED
Location Suite 1604-3, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Contact Person Richard SHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.